Exam 13: Statistical Process Control
Exam 1: Introduction126 Questions
Exam 2: Total Quality In Organizations105 Questions
Exam 3: Philosophies And Frameworks130 Questions
Exam 4: Strategic Focus For Performance Excellence104 Questions
Exam 5: Focusing On Customers97 Questions
Exam 6: High Performance Workforce Management109 Questions
Exam 7: Process Management98 Questions
Exam 8: Performance Measurement And Information Management129 Questions
Exam 9: Leading, building, and Sustaining Performance Excellence107 Questions
Exam 10: Statistical Thinking And Applications97 Questions
Exam 11: Six Sigma And Process Improvement78 Questions
Exam 12: Design For Quality And Product Excellence104 Questions
Exam 13: Statistical Process Control100 Questions
Select questions type
If points on a control chart are determined to be the result of special causes,the points should be eliminated and new control limit values should be computed.
(True/False)
4.8/5
(37)
For statistical process control,a good sampling method should always:
(Multiple Choice)
4.8/5
(39)
A machined part has a lower tolerance limit of 3.5 inches and an upper tolerance limit of 3.9 inches.The range for the pre-control green zone is:
(Multiple Choice)
4.9/5
(39)
Coils of synthetic rope are monitored for defects.Each coil contains 1,200 feet of rope.Eighteen coils were selected and the number of defects found in each coil is presented below.Identify an appropriate control chart and determine the chart's control limits.


(Essay)
4.9/5
(38)
In an
-chart,the upper control limit is equal to the overall sample mean plus three times the:

(Multiple Choice)
4.7/5
(40)
Because of high test costs,a single sample of wastewater sludge is tested daily for dissolved oxygen content.The appropriate control chart method is:
(Multiple Choice)
4.8/5
(40)
Process capability calculations make little sense if the process:
(Multiple Choice)
4.9/5
(33)
Determine the sample standard deviation for the following sample data: 7,9,2,0,1,and 5.
(Multiple Choice)
4.9/5
(21)
Which of the following is a likely cause of the control chart pattern known as a "trend?"
(Multiple Choice)
4.8/5
(32)
Define the term statistical process control.Outline the steps for setting up a control chart to monitor a process and determine its process capability.
(Essay)
4.9/5
(37)
The assumption of normality of observations is more critical fo
-charts than for x-charts.

(True/False)
4.8/5
(38)
Compared to variable inspection,attributes inspection requires _____ to obtain the same amount of statistical information about the quality of the product.
(Multiple Choice)
4.9/5
(40)
Which of the following would be used to monitor the number of nonconforming items?
(Multiple Choice)
4.8/5
(37)
A delivery company defines a "defect" as a package delivered later than the promised delivery time.Management wants to monitor the proportion of packages per week delivered beyond their promised delivery time.Management plans to sample 150 packages per week.The appropriate control chart is a(n):
(Multiple Choice)
4.8/5
(31)
If the variation in the process is due to common causes alone,the process is said to be:
(Multiple Choice)
4.8/5
(32)
A(n)_____ is a performance characteristic that is either present or absent in the product or service under consideration.
(Multiple Choice)
4.7/5
(43)
Control limits relate to _____,while specification limits relate to individual measurements.
(Multiple Choice)
4.9/5
(35)
If the sample size in a p-chart increases from 100 to 120,the upper and lower control limits will:
(Multiple Choice)
4.8/5
(38)
Showing 21 - 40 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)