Exam 13: Statistical Process Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

If points on a control chart are determined to be the result of special causes,the points should be eliminated and new control limit values should be computed.

(True/False)
4.8/5
(37)

The sample size for an x-chart:

(Multiple Choice)
4.7/5
(27)

For statistical process control,a good sampling method should always:

(Multiple Choice)
4.8/5
(39)

A machined part has a lower tolerance limit of 3.5 inches and an upper tolerance limit of 3.9 inches.The range for the pre-control green zone is:

(Multiple Choice)
4.9/5
(39)

The _____ is used to monitor the centering of the process.

(Multiple Choice)
4.9/5
(37)

Coils of synthetic rope are monitored for defects.Each coil contains 1,200 feet of rope.Eighteen coils were selected and the number of defects found in each coil is presented below.Identify an appropriate control chart and determine the chart's control limits. Coils of synthetic rope are monitored for defects.Each coil contains 1,200 feet of rope.Eighteen coils were selected and the number of defects found in each coil is presented below.Identify an appropriate control chart and determine the chart's control limits.

(Essay)
4.9/5
(38)

In an In an   -chart,the upper control limit is equal to the overall sample mean plus three times the: -chart,the upper control limit is equal to the overall sample mean plus three times the:

(Multiple Choice)
4.7/5
(40)

Because of high test costs,a single sample of wastewater sludge is tested daily for dissolved oxygen content.The appropriate control chart method is:

(Multiple Choice)
4.8/5
(40)

Process capability calculations make little sense if the process:

(Multiple Choice)
4.9/5
(33)

Determine the sample standard deviation for the following sample data: 7,9,2,0,1,and 5.

(Multiple Choice)
4.9/5
(21)

Which of the following is a likely cause of the control chart pattern known as a "trend?"

(Multiple Choice)
4.8/5
(32)

Define the term statistical process control.Outline the steps for setting up a control chart to monitor a process and determine its process capability.

(Essay)
4.9/5
(37)

The assumption of normality of observations is more critical fo The assumption of normality of observations is more critical fo   -charts than for x-charts. -charts than for x-charts.

(True/False)
4.8/5
(38)

Compared to variable inspection,attributes inspection requires _____ to obtain the same amount of statistical information about the quality of the product.

(Multiple Choice)
4.9/5
(40)

Which of the following would be used to monitor the number of nonconforming items?

(Multiple Choice)
4.8/5
(37)

A delivery company defines a "defect" as a package delivered later than the promised delivery time.Management wants to monitor the proportion of packages per week delivered beyond their promised delivery time.Management plans to sample 150 packages per week.The appropriate control chart is a(n):

(Multiple Choice)
4.8/5
(31)

If the variation in the process is due to common causes alone,the process is said to be:

(Multiple Choice)
4.8/5
(32)

A(n)_____ is a performance characteristic that is either present or absent in the product or service under consideration.

(Multiple Choice)
4.7/5
(43)

Control limits relate to _____,while specification limits relate to individual measurements.

(Multiple Choice)
4.9/5
(35)

If the sample size in a p-chart increases from 100 to 120,the upper and lower control limits will:

(Multiple Choice)
4.8/5
(38)
Showing 21 - 40 of 100