Exam 13: Supplement: Statistical Quality Control
Exam 1: Operations Management, Processes, and Supply Chain Management134 Questions
Exam 2: Corporate Strategy, Performance, and Sustainability133 Questions
Exam 3: Product Design and Development134 Questions
Exam 4: Process Design and Capacity Management134 Questions
Exam 5: Customer Relationships and Customer Service134 Questions
Exam 6: Demand Management, Forecasting, and Aggregate Planning133 Questions
Exam 7: Independent Demand Inventory Management133 Questions
Exam 8: Material Flow Analysis and Facility Layouts134 Questions
Exam 8: Supplement: Job Scheduling and Vehicle Routing55 Questions
Exam 9: Lean Systems128 Questions
Exam 10: Managing Customer and Work Flows133 Questions
Exam 11: Managing Information Flowsmrp and Erp134 Questions
Exam 12: Managing Projects133 Questions
Exam 13: Six Sigma Quality Management134 Questions
Exam 13: Supplement: Statistical Quality Control65 Questions
Exam 14: Global Supply Management133 Questions
Exam 15: Location, Logistics, and Product Returns134 Questions
Exam 16: Integrating Processes Along the Supply Chain134 Questions
Select questions type
A negative lower control limt for a P chart should be truncated to zero.
Free
(True/False)
4.9/5
(45)
Correct Answer:
True
A(n) _____ chart is used to monitor the percent defective in each sample.
Free
(Short Answer)
4.9/5
(22)
Correct Answer:
P
A reasonable number of samples collected for a control chart would be?
Free
(Multiple Choice)
4.8/5
(25)
Correct Answer:
D
After initial control chart construction, the first step to continue statistical monitoring of a process is?
(Multiple Choice)
4.9/5
(35)
A(n) _____ chart is used to monitor the count of number of defects per unit of output.
(Short Answer)
4.8/5
(36)
When a shipment is received from suppliers and samples are taken and compared to a quality acceptance standard, this is referred to as?
(Multiple Choice)
4.9/5
(29)
Graphic representations of process performance over time are referred to as?
(Multiple Choice)
4.7/5
(40)
Broadly speaking, SPC and SQC are considered to be similar concepts.
(True/False)
4.8/5
(42)
A process with a mean output of 14 and a standard deviation of output of 1 has been provided specification limits of 15 and 12. What is the Cpk value for this process?
(Multiple Choice)
4.7/5
(36)
Acceptance sampling relies on the inspection of every unit in a shipment.
(True/False)
4.8/5
(43)
An x-bar chart in which all points are within the control limits is likely?
(Multiple Choice)
4.7/5
(36)
Which chart is used to track central tendency of sample means?
(Multiple Choice)
4.9/5
(39)
Data that are continuous such as weight and time are what type of data?
(Multiple Choice)
4.7/5
(33)
A process with a mean output of 14 and a standard deviation of output of 1 has been provided specification limits of 15 and 12. Which statement below is most appropriate for this process?
(Multiple Choice)
4.7/5
(44)
________ variation is due to causes that can be corrected or fixed.
(Short Answer)
4.8/5
(39)
How does process capability analysis differ from the use of statistical process control charts?
(Essay)
4.9/5
(41)