Exam 14: Material Requirements Planning and Enterprise Resource Planning
Exam 1: Introduction to Operations Management47 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity44 Questions
Exam 3: Demand Forecasting62 Questions
Exam 4: Product Design54 Questions
Exam 5: Strategic Capacity Planning53 Questions
Exam 6: Process Design and Facility Layout59 Questions
Exam 7: Workjob Design53 Questions
Exam 8: Location Planning and Analysis45 Questions
Exam 9: Management of Quality48 Questions
Exam 10: Statistical Quality Control48 Questions
Exam 11: Supply Chain Management55 Questions
Exam 12: Inventory Management40 Questions
Exam 13: Aggregate Operations Planning and Master Scheduling46 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning53 Questions
Exam 15: Just-In-Time and Lean Production38 Questions
Exam 16: Job and Staff Scheduling42 Questions
Exam 17: Project Management61 Questions
Exam 18: Waiting-Line Analysis38 Questions
Exam 19: Answers to Selected Problems52 Questions
Exam 20: Tables7 Questions
Exam 21: Working With the Normal Distribution49 Questions
Select questions type
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It is only able to function on a
Unix platform.
(Multiple Choice)
4.9/5
(37)
A product file contains a unique standard identification code for each part or component.
(True/False)
4.8/5
(39)
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It allows decisions and
Databases from all parts of the organisation to be integrated.
(Multiple Choice)
4.9/5
(43)
Complete the MRP spreadsheet below for a component which is ordered in varying quantities over weeks 1 - 7. Week 0 1 2 3 4 5 6 7 Gross Requirement 5 20 10 10 20 10 25 Scheduled Receipts 0 30 0 30 25 0 30 Available Balance 12 Which answer should correctly replace the Xs?
(Multiple Choice)
4.8/5
(33)
Which of the following is unlikely to be included in demand management?
(Multiple Choice)
4.8/5
(40)
The management of customer orders and sale forecasts is called:
(Multiple Choice)
4.9/5
(41)
Known orders are increasingly critical in predicting total demand in the long term.
(True/False)
4.9/5
(34)
Enterprise Resource Planning (ERP) has been criticised on a number of grounds. Which of the following is NOT a common criticism of ERP?
(Multiple Choice)
4.8/5
(28)
Master Production Schedules can be used when chasing demand, when lagging demand or in
level scheduling.
(True/False)
4.7/5
(36)
Considering product structure shape, the more components and parts used at each level:
(Multiple Choice)
5.0/5
(42)
In MRP (Materials Requirements Planning) the Bill of Materials is:
(Multiple Choice)
4.8/5
(33)
Which of the following is NOT integrated within an ERP database?
(Multiple Choice)
4.8/5
(36)
ERP is set firmly within the context of the far broader MRP concept.
(True/False)
4.8/5
(38)
Which of the following is NOT of particular interest to the MRP process of calculating materials requirements?
(Multiple Choice)
4.8/5
(37)
Showing 21 - 40 of 53
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)