Exam 15: Key Concepts in Construction Management and Delivery Methods
Exam 1: The Construction Industry10 Questions
Exam 2: Project Participants10 Questions
Exam 3: Organizing and Leading the Construction Project9 Questions
Exam 4: Project Delivery Methods10 Questions
Exam 5: Project Chronology10 Questions
Exam 6: Construction Services During Design10 Questions
Exam 7: Bidding and Procurement10 Questions
Exam 8: Construction and Closeout10 Questions
Exam 9: Estimating Project Costs10 Questions
Exam 10: Project Planning and Scheduling10 Questions
Exam 11: Controlling Project Cost, Time, and Quality10 Questions
Exam 12: Job Site Administration10 Questions
Exam 13: Construction Law10 Questions
Exam 14: Construction Safety and Health10 Questions
Exam 15: Key Concepts in Construction Management and Delivery Methods135 Questions
Select questions type
The time for completing a project is equal to the sum of the duration of the individual work elements.
(True/False)
4.8/5
(44)
The ????design phase is complete when the design is approximately 30 percent complete.
(Multiple Choice)
4.7/5
(35)
Cost control can be approached as an application of Pareto's law, which states that ????percent of a project's outcome is determined by ????percent of the included elements.
(Multiple Choice)
4.8/5
(35)
The most important criterion for evaluating designers is their fee.
(True/False)
4.8/5
(41)
Identify the person responsible for the following aspects of a project.
-Value engineering
(Multiple Choice)
4.8/5
(32)
Match the description with the terms listed.Terms may be used only once.
-Might include water, sanitation, or storage areas
(Multiple Choice)
4.8/5
(45)
Match the letter in the project control chart shown in the figure with the corresponding item in the following.
-Historical information: Data base for future projects

(Short Answer)
4.8/5
(40)
The CM's field office is usually responsible for which duties?
(Multiple Choice)
4.8/5
(44)
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Evaluate and finalize mechanical and electrical systems
(Multiple Choice)
4.9/5
(34)
The???? type of organizational structure can be described as a "two-boss" system.
(Multiple Choice)
4.7/5
(41)
The ????section of a bid package identifies when and where to present the bid.
(Multiple Choice)
4.8/5
(34)
Match the letter in the project control chart shown in the figure with the corresponding item in the following.
-Field operations: The work site