The time for completing a project is equal to the sum of the duration of the individual work elements.

(True/False)
4.8/5
(44)

The ????design phase is complete when the design is approximately 30 percent complete.

(Multiple Choice)
4.7/5
(35)

Cost control can be approached as an application of Pareto's law, which states that ????percent of a project's outcome is determined by ????percent of the included elements.

(Multiple Choice)
4.8/5
(35)

The most important criterion for evaluating designers is their fee.

(True/False)
4.8/5
(41)

Identify the person responsible for the following aspects of a project. -Value engineering

(Multiple Choice)
4.8/5
(32)

Design/build means that????

(Multiple Choice)
4.7/5
(38)

Match the description with the terms listed.Terms may be used only once. -Might include water, sanitation, or storage areas

(Multiple Choice)
4.8/5
(45)

Match the letter in the project control chart shown in the figure with the corresponding item in the following. Match the letter in the project control chart shown in the figure with the corresponding item in the following.    -Historical information: Data base for future projects -Historical information: Data base for future projects

(Short Answer)
4.8/5
(40)

A work plan includes????

(Multiple Choice)
4.9/5
(39)

The CM's field office is usually responsible for which duties?

(Multiple Choice)
4.8/5
(44)

Identify in which listed project phase each following project activity would normally occur. Use each phase once only. -Evaluate and finalize mechanical and electrical systems

(Multiple Choice)
4.9/5
(34)

The???? type of organizational structure can be described as a "two-boss" system.

(Multiple Choice)
4.7/5
(41)

Time sheets and equipment use reports are examples of????

(Multiple Choice)
4.8/5
(44)

The ????section of a bid package identifies when and where to present the bid.

(Multiple Choice)
4.8/5
(34)

Match the letter in the project control chart shown in the figure with the corresponding item in the following. Match the letter in the project control chart shown in the figure with the corresponding item in the following.    -Field operations: The work site -Field operations: The work site

(Short Answer)
4.8/5
(43)