Exam 15: Key Concepts in Construction Management and Delivery Methods
Exam 1: The Construction Industry10 Questions
Exam 2: Project Participants10 Questions
Exam 3: Organizing and Leading the Construction Project9 Questions
Exam 4: Project Delivery Methods10 Questions
Exam 5: Project Chronology10 Questions
Exam 6: Construction Services During Design10 Questions
Exam 7: Bidding and Procurement10 Questions
Exam 8: Construction and Closeout10 Questions
Exam 9: Estimating Project Costs10 Questions
Exam 10: Project Planning and Scheduling10 Questions
Exam 11: Controlling Project Cost, Time, and Quality10 Questions
Exam 12: Job Site Administration10 Questions
Exam 13: Construction Law10 Questions
Exam 14: Construction Safety and Health10 Questions
Exam 15: Key Concepts in Construction Management and Delivery Methods135 Questions
Select questions type
Fair cost estimates represent the construction manager's appraisal to the owner of the fair value of the bid package.
(True/False)
4.9/5
(38)
Match the description with the terms listed.Terms may be used only once.
-Shows scheduled milestones and relationships among work packages
(Multiple Choice)
4.7/5
(39)
Match the description with the terms listed.Terms may be used only once.
-Shows outputs from cost/schedule engineering; compares actual to budget
(Multiple Choice)
4.9/5
(33)
In the case of design/build, the constructor acts as a general contractor with single-firm control of all subcontractors.
(True/False)
4.8/5
(36)
One major difference between equipment and material is that equipment does not become part of the project at the end of the job.
(True/False)
4.8/5
(38)
A (An) ????clause is issued during a dispute to bring in a professional to guide parties to a mutually acceptable settlement.
(Multiple Choice)
4.8/5
(32)
Which of the following are the three parties to a construction management contract?
(Multiple Choice)
4.9/5
(40)
The construction manager is responsible for submitting as-built drawings to the owner at the start of the project.
(True/False)
4.9/5
(32)
One advantage of a Design/Bid/Build delivery method is known project costs before construction begins.
(True/False)
5.0/5
(34)
Match the letter in the project control chart shown in the figure with the corresponding item in the following.
-Upper management: Final decisions and revisions before implementation

(Short Answer)
4.8/5
(45)
Site selection and financing would usually be the responsibility of the????
(Multiple Choice)
4.9/5
(41)
The construction manager prepares a ???? estimate for the purposes of evaluation, subcontractor bids, productivity analysis, and so on.
(Multiple Choice)
5.0/5
(31)
Which of the following would be considered an external factor that might affect a project's success?
(Multiple Choice)
4.7/5
(42)
The field office would typically accomplish which of the following tasks?
(Multiple Choice)
4.8/5
(29)
Which of the following would have the most impact on reducing job-site accidents?
(Multiple Choice)
4.8/5
(40)
In a guaranteed maximum price (GMP) contract, costs above the GMP are covered by the owner.
(True/False)
4.8/5
(41)
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Prepare addenda for pricing
(Multiple Choice)
4.9/5
(43)