Exam 15: Key Concepts in Construction Management and Delivery Methods
Exam 1: The Construction Industry10 Questions
Exam 2: Project Participants10 Questions
Exam 3: Organizing and Leading the Construction Project9 Questions
Exam 4: Project Delivery Methods10 Questions
Exam 5: Project Chronology10 Questions
Exam 6: Construction Services During Design10 Questions
Exam 7: Bidding and Procurement10 Questions
Exam 8: Construction and Closeout10 Questions
Exam 9: Estimating Project Costs10 Questions
Exam 10: Project Planning and Scheduling10 Questions
Exam 11: Controlling Project Cost, Time, and Quality10 Questions
Exam 12: Job Site Administration10 Questions
Exam 13: Construction Law10 Questions
Exam 14: Construction Safety and Health10 Questions
Exam 15: Key Concepts in Construction Management and Delivery Methods135 Questions
Select questions type
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Analyze alternative schemes and conduct engineering analysis
(Multiple Choice)
4.8/5
(43)
The???? is the maximum amount of time an activity can be delayed without extending the overall project completion time.
(Multiple Choice)
5.0/5
(29)
Match the letter in the project control chart shown in the figure with the corresponding item in the following.
-Home office: Estimating, scheduling, and engineering

(Short Answer)
4.9/5
(39)
Which of the following would not be included in a typical site investigation?
(Multiple Choice)
4.8/5
(40)
Banks, office towers, and schools would be classified as what type of project?
(Multiple Choice)
4.9/5
(35)
Communication between home and field office is both infrequent and unimportant.
(True/False)
4.8/5
(39)
Project scheduling techniques, such as CPM, are unique to the construction industry.
(True/False)
4.8/5
(39)
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Review and recommend trade contracts with owner
(Multiple Choice)
4.9/5
(37)
In preparing an estimate, ???? costs account for vacation time, sick days, and so on.
(Multiple Choice)
4.8/5
(35)
In the construction industry of the future, there will likely be a decreased requirement for permits and regulations.
(True/False)
4.7/5
(45)
What term(s) is (are) used to describe the extra time that might be included in an construction activity?
(Multiple Choice)
4.9/5
(29)
Which of the following characteristics should an owner investigate when choosing a construction manager?
(Multiple Choice)
4.8/5
(37)
On-site mobilization is the process during which the site is made ready for construction to begin.
(True/False)
4.7/5
(36)
Match the type of schedule listed with the description following. Schedule types may be used more than once.
-Graphically the simplest
(Multiple Choice)
4.7/5
(35)
Which category of construction is characterized by many small companies and great instability during economic recessions?
(Multiple Choice)
4.8/5
(34)
Which category of construction is typically financed by the public sector?
(Multiple Choice)
4.9/5
(35)
Match the description with the terms listed.Terms may be used only once.
-Defines technical requirements of job, scope, and quality
(Multiple Choice)
4.7/5
(44)
Organizational charts show a company's organizational structure in pictorial form.
(True/False)
5.0/5
(34)