Exam 15: Key Concepts in Construction Management and Delivery Methods
Exam 1: The Construction Industry10 Questions
Exam 2: Project Participants10 Questions
Exam 3: Organizing and Leading the Construction Project9 Questions
Exam 4: Project Delivery Methods10 Questions
Exam 5: Project Chronology10 Questions
Exam 6: Construction Services During Design10 Questions
Exam 7: Bidding and Procurement10 Questions
Exam 8: Construction and Closeout10 Questions
Exam 9: Estimating Project Costs10 Questions
Exam 10: Project Planning and Scheduling10 Questions
Exam 11: Controlling Project Cost, Time, and Quality10 Questions
Exam 12: Job Site Administration10 Questions
Exam 13: Construction Law10 Questions
Exam 14: Construction Safety and Health10 Questions
Exam 15: Key Concepts in Construction Management and Delivery Methods135 Questions
Select questions type
Learning curve and work schedule studies would be used in estimating the???? of an estimate.
(Multiple Choice)
4.9/5
(42)
Match the letter in the project control chart shown in the figure with the corresponding item in the following.
-External factors

(Short Answer)
4.9/5
(40)
One advantage of the design/build approach is that usually a firm project cost is established before construction begins.
(True/False)
4.8/5
(31)
Match the description with the terms listed.Terms may be used only once.
-Defines conditions applicable to all contracts awarded
(Multiple Choice)
4.9/5
(33)
Match the type of schedule listed with the description following. Schedule types may be used more than once.
-Would be used for a summary report to the owner
(Multiple Choice)
4.8/5
(40)
Match the type of schedule listed with the description following. Schedule types may be used more than once.
-Could also be termed precedent notation
(Multiple Choice)
4.8/5
(35)
The developer of a 40-story high-rise office building desires the shortest possible construction time. What contractual arrangement would be best?
(Multiple Choice)
4.8/5
(37)
Construction managers are usually hired in a professional capacity, as are architects and engineers.
(True/False)
4.9/5
(40)
Identify the person responsible for the following aspects of a project.
-Drawings and specifications
(Multiple Choice)
4.8/5
(39)
In a Design/Bid/Build arrangement, a (an) ????contract is most likely used between a general contractor and an owner.
(Multiple Choice)
4.8/5
(32)
If an owner has only a fixed amount to spend and would not build a project if its cost would exceed this amount, construction management would be the preferred delivery method.
(True/False)
4.8/5
(39)
Unlike the high-technology industry, the construction industry does not place much emphasis on R & D.
(True/False)
4.9/5
(32)
Match the description with the terms listed.Terms may be used only once.
-Tracks submittals
(Multiple Choice)
4.8/5
(31)
When compared to other delivery method options, which of the following is not considered an advantage of Design/Bid/Build delivery?
(Multiple Choice)
4.7/5
(31)
Traditionally, concept and feasibility studies are handled by the????
(Multiple Choice)
4.9/5
(42)
The ????section of a bid package defines the technical requirements, scope, and quality of the project.
(Multiple Choice)
4.8/5
(38)
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Approve trade contractor progress payments
(Multiple Choice)
4.8/5
(37)
Construction management is superior to Design/Bid/Build approaches at addressing which of the following concerns?
(Multiple Choice)
4.9/5
(36)