Which category of construction would typically be contracted out as design/build?

(Multiple Choice)
4.9/5
(42)

A structural engineer is responsible for locating a building on a site and identifying the correct setbacks and elevations.

(True/False)
4.9/5
(38)

Identify in which listed project phase each following project activity would normally occur. Use each phase once only. -Identify long-lead items

(Multiple Choice)
4.7/5
(31)

The use of material safety data sheets (MSDS) would be of prime importance in which aspect of a safety program?

(Multiple Choice)
4.7/5
(30)

Cost indices reflect changes in cost over time.

(True/False)
4.8/5
(40)

Which of the following would not be classified as a direct cost?

(Multiple Choice)
4.8/5
(38)

Career opportunities as a construction professional would not include????

(Multiple Choice)
4.9/5
(35)

Which of the project types listed would most frequently use a construction management arrangement?

(Multiple Choice)
4.8/5
(37)

Match the description with the terms listed.Terms may be used only once. -States requirements and procedures for responsive bid

(Multiple Choice)
4.8/5
(42)

Which of the following situations requires a change order?

(Multiple Choice)
4.8/5
(33)

Identify in which listed project phase each following project activity would normally occur. Use each phase once only. -Submit as-built drawings

(Multiple Choice)
4.7/5
(40)

Dams, highways, and bridges would be classified as what type of project?

(Multiple Choice)
4.8/5
(49)

Drawings and specifications are the output of what stage of a project?

(Multiple Choice)
5.0/5
(41)

Value engineering is normally the responsibility of which team member?

(Multiple Choice)
4.7/5
(33)

The ????section of the bid package might include information concerning provisions for water and other utilities, sanitation equipment, or storage areas.

(Multiple Choice)
4.7/5
(33)

Match the description with the terms listed.Terms may be used only once. -Documents official start of project

(Multiple Choice)
4.9/5
(35)

Final as-built drawings are submitted to????

(Multiple Choice)
4.8/5
(30)

Which of the following is not typically a support staff responsibility?

(Multiple Choice)
5.0/5
(39)

Identify the person responsible for the following aspects of a project. -Financing

(Multiple Choice)
4.9/5
(34)

Identify in which listed project phase each following project activity would normally occur. Use each phase once only. -Finalize permit procedural flow

(Multiple Choice)
4.9/5
(41)
Showing 41 - 60 of 135