Exam 15: Key Concepts in Construction Management and Delivery Methods
Exam 1: The Construction Industry10 Questions
Exam 2: Project Participants10 Questions
Exam 3: Organizing and Leading the Construction Project9 Questions
Exam 4: Project Delivery Methods10 Questions
Exam 5: Project Chronology10 Questions
Exam 6: Construction Services During Design10 Questions
Exam 7: Bidding and Procurement10 Questions
Exam 8: Construction and Closeout10 Questions
Exam 9: Estimating Project Costs10 Questions
Exam 10: Project Planning and Scheduling10 Questions
Exam 11: Controlling Project Cost, Time, and Quality10 Questions
Exam 12: Job Site Administration10 Questions
Exam 13: Construction Law10 Questions
Exam 14: Construction Safety and Health10 Questions
Exam 15: Key Concepts in Construction Management and Delivery Methods135 Questions
Select questions type
Which category of construction would typically be contracted out as design/build?
(Multiple Choice)
4.9/5
(42)
A structural engineer is responsible for locating a building on a site and identifying the correct setbacks and elevations.
(True/False)
4.9/5
(38)
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Identify long-lead items
(Multiple Choice)
4.7/5
(31)
The use of material safety data sheets (MSDS) would be of prime importance in which aspect of a safety program?
(Multiple Choice)
4.7/5
(30)
Which of the following would not be classified as a direct cost?
(Multiple Choice)
4.8/5
(38)
Career opportunities as a construction professional would not include????
(Multiple Choice)
4.9/5
(35)
Which of the project types listed would most frequently use a construction management arrangement?
(Multiple Choice)
4.8/5
(37)
Match the description with the terms listed.Terms may be used only once.
-States requirements and procedures for responsive bid
(Multiple Choice)
4.8/5
(42)
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Submit as-built drawings
(Multiple Choice)
4.7/5
(40)
Dams, highways, and bridges would be classified as what type of project?
(Multiple Choice)
4.8/5
(49)
Drawings and specifications are the output of what stage of a project?
(Multiple Choice)
5.0/5
(41)
Value engineering is normally the responsibility of which team member?
(Multiple Choice)
4.7/5
(33)
The ????section of the bid package might include information concerning provisions for water and other utilities, sanitation equipment, or storage areas.
(Multiple Choice)
4.7/5
(33)
Match the description with the terms listed.Terms may be used only once.
-Documents official start of project
(Multiple Choice)
4.9/5
(35)
Which of the following is not typically a support staff responsibility?
(Multiple Choice)
5.0/5
(39)
Identify the person responsible for the following aspects of a project.
-Financing
(Multiple Choice)
4.9/5
(34)
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Finalize permit procedural flow
(Multiple Choice)
4.9/5
(41)