Exam 11: Layout Strategies
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management123 Questions
Exam 4: Forecasting144 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 7: Statistical Process Control154 Questions
Exam 8: Process Strategy131 Questions
Exam9: Capacity and Constraint Management107 Questions
Exam 10: Location Strategies140 Questions
Exam 11: Layout Strategies161 Questions
Exam 12: Human Resources, Job Design, and Work Measurement191 Questions
Exam 13: Supply-Chain Management145 Questions
Exam 14: Outsourcing as a Supply-Chain Strategy73 Questions
Exam 15: Inventory Management155 Questions
Exam 16: Aggregate Planning134 Questions
Exam 17: Material Requirements Planning MRP and ERP169 Questions
Exam 18: Short-Term Scheduling139 Questions
Exam 19: Just-In-Time and Lean Options137 Questions
Exam 20: Maintenance and Reliability130 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation93 Questions
Select questions type
Which of the following is not one of the factors complicating the techniques for addressing the fixed position layout?
(Multiple Choice)
4.8/5
(36)
What are the two basic types of product layouts?
Explain how they are alike, and how they are different.
(Essay)
4.9/5
(38)
What is cross-docking?
Why is it appropriate for some forms of warehouse layout?
(Essay)
4.8/5
(38)
Brandon's computer shop has hired a consultant to help apply operation management techniques to increase profits. Currently the shop sells most of its computers to a high-end customized online retailer and sales are steady at 250 per month. A single work cell produces the computers. To produce the computer three operations are required. First the parts must be assembled, next software must be installed, and finally the computer must be safely packed and labeled for shipping. These operations take 2 hours, 5 hours, and 1 hour respectively. If there are 6 available work hours each day and the shop operates 20 days per month find:
A: The takt time
B: The number of workers Brandon should hire
(Essay)
4.8/5
(40)
Which of the following is true regarding fabrication lines?
(Multiple Choice)
4.8/5
(44)
What is the primary reason why retailers tend to locate high-draw items around the periphery of the store?
(Multiple Choice)
4.9/5
(35)
The assumptions necessary for a successful product layout include all of the following except
(Multiple Choice)
4.9/5
(44)
The most common tactic followed in process-layout planning is to arrange departments or work centers so they
(Multiple Choice)
4.8/5
(36)
A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet a schedule of 400 units per day. The tasks necessary to produce this product are detailed in the table below.
Task Predecessor Time (seconds) - 50 36 - 26 - 22 , 70 , 30
a. Draw the network described in the table.
b. Without regard to a production schedule, what is the minimum possible cycle time (in seconds) for this situation; what is the maximum?
c. What is the required cycle time (in seconds) in order to meet the schedule?
d. What is the theoretical minimum number of workstations needed to meet the schedule?
e. Balance this line using longest processing time.
f. What is the efficiency of the balance obtained in part e?
(Essay)
4.7/5
(43)
A(n) __________ is a special product-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility.
(Short Answer)
4.9/5
(50)
Solving a load-distance problem for a process-oriented layout requires that
(Multiple Choice)
4.8/5
(44)
The major problem addressed by the warehouse layout strategy is
(Multiple Choice)
4.8/5
(33)
An assembly line consists of 158 tasks grouped into 32 workstations. The sum of all task times is 105 minutes. The largest assigned cycle time is 4 minutes. The efficiency of this line is approximately
(Multiple Choice)
4.7/5
(44)
A production line is to be designed for a job with four tasks. The task times are 2.4 minutes, 1.4 minutes, 0.9 minutes, and 1.7 minutes. After line balancing, the largest possible assigned cycle time is ________ and the smallest possible assigned cycle time is ________ minutes.
(Multiple Choice)
4.9/5
(36)
The main advantage of a product-oriented layout is typically
(Multiple Choice)
4.9/5
(31)
Which of the following layouts generally has the best machine utilization?
(Multiple Choice)
5.0/5
(36)
The work cell layout, a special arrangement of machinery and equipment to focus on the production of a single product or group of related products, is for manufacturing applications and has no relevance to services.
(True/False)
4.9/5
(33)