A grocery store is attempting to implement a kanban system. Which of the following would not be an application of kanbans?

Free
(Multiple Choice)
4.7/5
(33)
Correct Answer:
Verified

D

Which of the following is true regarding the steps to reducing setup times?

Free
(Multiple Choice)
4.7/5
(34)
Correct Answer:
Verified

E

Which of the following is characteristic of lean operations?

Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
Verified

D

The technique known as level schedules

(Multiple Choice)
4.7/5
(36)

Daily demand is half of daily production. If setup and holding costs are equal, determine how Q and D are related.

(Essay)
4.9/5
(34)

JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from manufacturer firm to the supplier firm.

(True/False)
4.9/5
(35)

A bakery uses 5 containers that hold 3 cakes. Daily demand is 10 cakes and safety stock is 5 cakes. What is the lead time?

(Short Answer)
4.9/5
(25)

Which of the following is an illustration of employee empowerment?

(Multiple Choice)
4.9/5
(35)

Compare and contrast throughput with manufacturing cycle time.

(Essay)
4.7/5
(36)

The Toyota Production System requires that activities have built-in, automatic tests so that gaps between expectations and actuality are immediately evident.

(True/False)
4.8/5
(37)

The list of 5S's, although it looks like a housekeeping directive, supports lean production by

(Multiple Choice)
4.8/5
(32)

JIT systems carry inventory just in case something goes wrong.

(True/False)
4.8/5
(29)

A product has annual demand of 100,000 units. The plant manager wants production to follow a four-hour cycle. Based on the following data, what setup cost will enable the desired production cycle? d=400 per day (250 days per year), p=4000 units per day, H=$40 per unit per year, and Q=200 (demand for four hours, half a day).

(Multiple Choice)
4.9/5
(36)

What are the five reasons given by suppliers for their reluctance to enter into JIT systems? Elaborate on one of these, of your choosing.

(Essay)
4.8/5
(28)

Handling material more than once is an example of the waste called __________.

(Short Answer)
4.8/5
(30)

Which one of the following scenarios represents the use of a kanban to reduce inventories?

(Multiple Choice)
4.8/5
(36)

Identify the inventory tactics appropriate for a JIT environment.

(Essay)
4.8/5
(44)

Characteristics of just-in-time partnerships do not include

(Multiple Choice)
4.9/5
(39)

Which one of the following is not a requirement of JIT systems?

(Multiple Choice)
4.9/5
(31)

Customer demand will always remain an unknown, so it is not considered a source of variation.

(True/False)