Exam 19: Just-In-Time and Lean Options
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management123 Questions
Exam 4: Forecasting144 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 7: Statistical Process Control154 Questions
Exam 8: Process Strategy131 Questions
Exam9: Capacity and Constraint Management107 Questions
Exam 10: Location Strategies140 Questions
Exam 11: Layout Strategies161 Questions
Exam 12: Human Resources, Job Design, and Work Measurement191 Questions
Exam 13: Supply-Chain Management145 Questions
Exam 14: Outsourcing as a Supply-Chain Strategy73 Questions
Exam 15: Inventory Management155 Questions
Exam 16: Aggregate Planning134 Questions
Exam 17: Material Requirements Planning MRP and ERP169 Questions
Exam 18: Short-Term Scheduling139 Questions
Exam 19: Just-In-Time and Lean Options137 Questions
Exam 20: Maintenance and Reliability130 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation93 Questions
Select questions type
Which of the following statements regarding a pull system is true?
(Multiple Choice)
4.8/5
(37)
Explain how JIT works in services. After all, how does "small lot size" and "reduce setup cost" make sense in services?
Supply examples to support your work.
(Essay)
4.9/5
(32)
__________ is any deviation from the optimum process that delivers perfect product on time, every time.
(Short Answer)
4.9/5
(45)
The main focus of JIT efforts to reduce investment in inventory requires __________.
(Short Answer)
4.8/5
(34)
__________ gets suppliers to accept responsibility for satisfying end customer needs.
(Short Answer)
4.9/5
(35)
Which of the following is generally found in most JIT environments?
(Multiple Choice)
4.7/5
(30)
Identify Ohno's Seven Wastes. Which one of these deals most directly with distance reductions?
(Essay)
4.8/5
(34)
If setup times and costs can be reduced enough, the JIT ideal of "Lot Size = 1" can be achieved.
(True/False)
4.9/5
(34)
Which of the following is specifically characterized by the elimination of waste through a focus on exactly what the customer wants?
(Multiple Choice)
4.7/5
(32)
The quality management tool called poka-yoke is not relevant to JIT systems.
(True/False)
4.9/5
(36)
Which of the following is not characteristic of a TPS employee?
(Multiple Choice)
4.9/5
(32)
Daily usage of a product is 10 in a facility that operates every day of the year. Setup cost is $68 and annualized carrying cost is $100. Daily production of this product is 20. Lead time is 14 days; safety stock is one day's production. What is the optimum kanban size, and number of kanbans?
(Short Answer)
4.9/5
(35)
Hidden problems are generally uncovered during the process of reducing inventory.
(True/False)
4.8/5
(37)
Which one of the following statements is true about the kanban system?
(Multiple Choice)
4.8/5
(38)
A firm wants to develop a level material use schedule based on the following data. What should be the setup cost?
Desired lot size: 60 Annual demand: 40,000 Holding cost: \ 20 per unit per year Daily production rate 320 Work days per year: 250
(Multiple Choice)
5.0/5
(27)
In a JIT system, product inspection adds value by identifying defective items.
(True/False)
4.7/5
(33)
Which one of the following is a concern expressed by suppliers?
(Multiple Choice)
4.9/5
(31)
Showing 61 - 80 of 137
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)