Exam 19: Just-In-Time and Lean Options

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following statements regarding a pull system is true?

(Multiple Choice)
4.8/5
(37)

Throughput measures the time

(Multiple Choice)
5.0/5
(33)

Identify JIT scheduling tactics.

(Essay)
4.9/5
(31)

TPS stands for Total Production Streamlining.

(True/False)
4.9/5
(34)

Explain how JIT works in services. After all, how does "small lot size" and "reduce setup cost" make sense in services? Supply examples to support your work.

(Essay)
4.9/5
(32)

__________ is any deviation from the optimum process that delivers perfect product on time, every time.

(Short Answer)
4.9/5
(45)

The main focus of JIT efforts to reduce investment in inventory requires __________.

(Short Answer)
4.8/5
(34)

__________ gets suppliers to accept responsibility for satisfying end customer needs.

(Short Answer)
4.9/5
(35)

Which of the following is generally found in most JIT environments?

(Multiple Choice)
4.7/5
(30)

Identify Ohno's Seven Wastes. Which one of these deals most directly with distance reductions?

(Essay)
4.8/5
(34)

If setup times and costs can be reduced enough, the JIT ideal of "Lot Size = 1" can be achieved.

(True/False)
4.9/5
(34)

Which of the following is specifically characterized by the elimination of waste through a focus on exactly what the customer wants?

(Multiple Choice)
4.7/5
(32)

The quality management tool called poka-yoke is not relevant to JIT systems.

(True/False)
4.9/5
(36)

Which of the following is not characteristic of a TPS employee?

(Multiple Choice)
4.9/5
(32)

Daily usage of a product is 10 in a facility that operates every day of the year. Setup cost is $68 and annualized carrying cost is $100. Daily production of this product is 20. Lead time is 14 days; safety stock is one day's production. What is the optimum kanban size, and number of kanbans?

(Short Answer)
4.9/5
(35)

Hidden problems are generally uncovered during the process of reducing inventory.

(True/False)
4.8/5
(37)

Which one of the following statements is true about the kanban system?

(Multiple Choice)
4.8/5
(38)

A firm wants to develop a level material use schedule based on the following data. What should be the setup cost? Desired lot size: 60 Annual demand: 40,000 Holding cost: \ 20 per unit per year Daily production rate 320 Work days per year: 250

(Multiple Choice)
5.0/5
(27)

In a JIT system, product inspection adds value by identifying defective items.

(True/False)
4.7/5
(33)

Which one of the following is a concern expressed by suppliers?

(Multiple Choice)
4.9/5
(31)
Showing 61 - 80 of 137
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)