Every event node in the PERT network is identified with a four-part scorecard. Which of the following is the correct four-part scorecard?

(Multiple Choice)
4.8/5
(38)

Normal time is associated with the minimum necessary spending on project activities because there is no stress on completing the project as soon as possible.

(True/False)
4.8/5
(26)

The following table refers to a project to build a new gym and exercise facility. The following table refers to a project to build a new gym and exercise facility.    How long will it take to complete the project? How long will it take to complete the project?

(Essay)
4.8/5
(46)

The Gantt project-planning chart for a manufacturing system starts with assembling,moves to planning,and ends with certification.

(True/False)
4.9/5
(46)

The largest value of EF and LF at the last node in the network is the

(Multiple Choice)
4.9/5
(40)

Explicit information requires synchronous transmission meaning that the teacher and the student must be in direct communication.

(True/False)
4.8/5
(38)

Which of the following is the first step required to utilize PERT-type network models?

(Multiple Choice)
5.0/5
(34)

Explicit knowledge is the description of what must be done to make things work.

(True/False)
4.8/5
(36)

The ultimate test of explicit information is whether it can be studied successfully using distance learning methods.

(True/False)
4.8/5
(45)

Gantt project-planning methods,based on graphical analysis,can lead to optimal resource utilization or provide sufficient project-tracking capability for the complex projects that now are undertaken by large organizations.

(True/False)
4.8/5
(38)

A good estimator increases the organization's revenues by not overestimating costs which

(Multiple Choice)
4.9/5
(37)

Simulations can be run using the means and variance information to determine the percent of time that each path becomes _____. Much attention should be paid to the paths that become _____ most often.

(Multiple Choice)
4.9/5
(39)

New products accomplish which of the following?

(Multiple Choice)
4.9/5
(44)

Change management projects called (a) require planning,designing,building,testing,redesigning,and implementing the system.

(True/False)
5.0/5
(32)

Which of the choices below is a challenge created by multiple projects?

(Multiple Choice)
4.9/5
(37)

The kinds of problems encountered in projects are different from those encountered in the job shop and flow shop.

(True/False)
4.9/5
(26)

Crashing is generally used to decrease the length of the critical path.

(True/False)
4.8/5
(33)

Products have life cycle stages which means that the project environment is dynamic and challenging.

(True/False)
4.8/5
(34)

Projects can include some repetitive activities.

(True/False)
4.9/5
(42)

The following activities and immediate predecessors define a new classroom building construction project on a growing college campus: The following activities and immediate predecessors define a new classroom building construction project on a growing college campus:     Identify the critical path.How long will it take to complete the project? Identify the critical path.How long will it take to complete the project?