Exam 18: Project Management for New Products and Processes
Exam 1: Product Line Planning and the Systems Approach114 Questions
Exam 2: Productivity and Strategic Planning115 Questions
Exam 3: Demand Creation and Predictive Planning114 Questions
Exam 4: Understanding Quality: ITS Management and Strategic Importance114 Questions
Exam 5: Process Configuration Strategies111 Questions
Exam 6: Process Analysis and Redesign115 Questions
Exam 7: Quality Assurance115 Questions
Exam 8: Management of Technology Mot101 Questions
Exam 9: Teamwork Planning Requires Job Design113 Questions
Exam 10: Supply Chain Capacity Planning113 Questions
Exam 11: Facilities Planning: Location and Layout112 Questions
Exam 12: Materials Management Impacts All Supply Chain Participants110 Questions
Exam 13: Aggregate Planning to Balance Supply and Demand106 Questions
Exam 14: Inventory Management for Smooth and Continuous Demand Patterns114 Questions
Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns116 Questions
Exam 16: Production Scheduling for Manufacturing and Service Operations116 Questions
Exam 17: Cycle-Time Management Increases Productivity117 Questions
Exam 18: Project Management for New Products and Processes110 Questions
Exam 19: Change Management With Faster Project Completions103 Questions
Exam 20: Sustainability Issues: Environment, Ethics, and Security111 Questions
Select questions type
Every event node in the PERT network is identified with a four-part scorecard. Which of the following is the correct four-part scorecard?
(Multiple Choice)
4.8/5
(38)
Normal time is associated with the minimum necessary spending on project activities because there is no stress on completing the project as soon as possible.
(True/False)
4.8/5
(26)
The following table refers to a project to build a new gym and exercise facility.
How long will it take to complete the project?

(Essay)
4.8/5
(46)
The Gantt project-planning chart for a manufacturing system starts with assembling,moves to planning,and ends with certification.
(True/False)
4.9/5
(46)
The largest value of EF and LF at the last node in the network is the
(Multiple Choice)
4.9/5
(40)
Explicit information requires synchronous transmission meaning that the teacher and the student must be in direct communication.
(True/False)
4.8/5
(38)
Which of the following is the first step required to utilize PERT-type network models?
(Multiple Choice)
5.0/5
(34)
Explicit knowledge is the description of what must be done to make things work.
(True/False)
4.8/5
(36)
The ultimate test of explicit information is whether it can be studied successfully using distance learning methods.
(True/False)
4.8/5
(45)
Gantt project-planning methods,based on graphical analysis,can lead to optimal resource utilization or provide sufficient project-tracking capability for the complex projects that now are undertaken by large organizations.
(True/False)
4.8/5
(38)
A good estimator increases the organization's revenues by not overestimating costs which
(Multiple Choice)
4.9/5
(37)
Simulations can be run using the means and variance information to determine the percent of time that each path becomes _____. Much attention should be paid to the paths that become _____ most often.
(Multiple Choice)
4.9/5
(39)
Change management projects called (a) require planning,designing,building,testing,redesigning,and implementing the system.
(True/False)
5.0/5
(32)
Which of the choices below is a challenge created by multiple projects?
(Multiple Choice)
4.9/5
(37)
The kinds of problems encountered in projects are different from those encountered in the job shop and flow shop.
(True/False)
4.9/5
(26)
Crashing is generally used to decrease the length of the critical path.
(True/False)
4.8/5
(33)
Products have life cycle stages which means that the project environment is dynamic and challenging.
(True/False)
4.8/5
(34)
The following activities and immediate predecessors define a new classroom building construction project on a growing college campus:
Identify the critical path.How long will it take to complete the project?

(Essay)
4.9/5
(35)