Exam 18: Project Management for New Products and Processes

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

For cost estimates,when project bidding is used,underestimating the cost of a job results in _____.

(Multiple Choice)
4.9/5
(37)

Unlike explicit knowledge,tacit knowledge never requires synchronous transmission.

(True/False)
4.7/5
(37)

Which choice translates to allowable slippage in an activity's schedule along a slack path?

(Multiple Choice)
5.0/5
(47)

Project management requires good estimates to time to:

(Multiple Choice)
4.8/5
(47)

What does the control management process entail?

(Multiple Choice)
4.8/5
(44)

The following activities and immediate predecessors define a new classroom building construction project on a growing college campus: The following activities and immediate predecessors define a new classroom building construction project on a growing college campus:     Draw the CPM network diagram.Alternatively,create a table showing the ES,EF,LS,and LF for each activity.Calculate the early start time (ES),early finish time (EF),late start time (LS),late finish time (LF),and slack for each activity. Draw the CPM network diagram.Alternatively,create a table showing the ES,EF,LS,and LF for each activity.Calculate the early start time (ES),early finish time (EF),late start time (LS),late finish time (LF),and slack for each activity.

(Essay)
5.0/5
(50)

In _____,project activities are the connecting arrows.Each arrow starts with a numbered node and ends with a larger numbered node.The arrow can be identified by these numbers.

(Multiple Choice)
4.8/5
(25)

Activity time estimation in the PERT system utilizes an optimistic estimate,a pessimistic estimate,and a most likely estimate of time required to complete each project activity.

(True/False)
4.9/5
(35)

Correct information gathering is the function of marketing intelligence.

(True/False)
4.8/5
(41)

_____ enables the project managers to determine how long it will take to complete the project.

(Multiple Choice)
4.9/5
(39)

The tactical aspect of resource leveling is that it can affect the entire system's timing without changing the budgets.

(True/False)
4.9/5
(34)

PERT information systems show that team members are communicating with each other while monitoring progress.

(True/False)
4.8/5
(39)

The existence of slack is an important condition for resource leveling.

(True/False)
4.7/5
(42)

Projects are time-based endeavors that bring together skills and technology to accomplish goals.

(True/False)
4.8/5
(45)

In-person,classroom teaching remains one of the best ways to transfer tacit information.

(True/False)
4.7/5
(37)

PERT charts are introduced with deterministic estimates to keep the discussion focused on:

(Multiple Choice)
4.8/5
(36)

Which is the most essential rule that applies to project management?

(Multiple Choice)
4.9/5
(31)

Good resource allocation decisions are a P/OM project management responsibility.

(True/False)
4.9/5
(44)

For managers responsible for multiple projects,the sharing of information in an efficient way is an opportunity for synergy and serendipity,through coordination of their efforts.

(True/False)
4.8/5
(30)

Change management projects are unique work configurations that demand specific capabilities including leadership and teamwork.

(True/False)
4.8/5
(36)
Showing 61 - 80 of 110
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)