Exam 16: Scheduling
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, while Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Abe to build the doghouse?
(Multiple Choice)
4.9/5
(34)
Can an optimum assignment be made after the first modification of the row and column reductions table?
(Short Answer)
4.8/5
(31)
Bottlenecks may shift with the passage of time, so that different operations become bottleneck operations at different times.
(True/False)
4.8/5
(25)
Using the cost information given in the table below, assign work crews to jobs so that total cost is minimized.
(Essay)
4.8/5
(25)
What is the average completion time for the shortest processing time (SPT) priority rule? Average job tardiness? Average number of jobs at the center?
(Short Answer)
4.8/5
(38)
Priority rules are widely used to sequence jobs in high-volume systems.
(True/False)
4.9/5
(37)
What is the optimum job sequence for the jobs listed below using Johnson's Rule? 

(Multiple Choice)
4.8/5
(29)
Job X arrived at work center Q at noon.At 2 p.m.that same day X was begun.X left work center Q at 3:15 p.m.that same day.X's flow time, in minutes, was __________.
(Multiple Choice)
4.8/5
(38)
A manager must assign four engineers to projects, one to a project.The leader of Project C has indicated that he does not want engineer 2 or 3 on his project.Given the cost figures below for each project-engineer combination, and keeping in mind that two combinations are undesirable, determine assignments such that total cost will be minimized.
(Essay)
4.8/5
(37)
In a single work center, makespan improvement can be accomplished by selecting the optimal sequencing rule.
(True/False)
4.9/5
(47)
For the optimal schedule, what is the total number of hours required to complete these jobs?
(Multiple Choice)
4.7/5
(31)
The matrix below shows relative costs for various job-machine combinations.Which set of pairs constitutes the minimum-cost solution using the Assignment method? 

(Multiple Choice)
4.9/5
(45)
In an assignment model where there are fewer jobs than resources:
(Multiple Choice)
4.8/5
(35)
Can an optimum assignment be made after the row and column reductions?
(Short Answer)
4.7/5
(32)
If he uses the shortest processing time first (SPT) priority rule to schedule these jobs, what will be the average number of jobs in his shop today?
(Multiple Choice)
4.7/5
(34)
Showing 101 - 120 of 134