Exam 16: Scheduling

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is critical to effective yield management?

(Multiple Choice)
4.8/5
(31)

What is the average completion time for the first come, first served (FCFS) priority rule schedule? Average job tardiness? Average number of jobs at the center?

(Short Answer)
4.8/5
(36)

What is the result of modifying the row and column reductions table?

(Essay)
4.8/5
(38)

When does idle time occur at machine B for the optimum schedule?

(Essay)
4.9/5
(41)

Using the EDD rule, the sequence of jobs would be:

(Multiple Choice)
4.7/5
(31)

Input/output (I/O) control refers to monitoring the productivity changes since productivity is determined by the ratio of Output to Input.

(True/False)
4.8/5
(34)

After the row and column reductions, what is the reduced time for assigning resource 4 to job D?

(Multiple Choice)
4.7/5
(50)

Which of the following is least likely to be a consideration when scheduling a high-volume system?

(Multiple Choice)
4.9/5
(33)

What is the average completion time for the slack per operation (S/O) priority rule schedule? Average job tardiness? Average number of jobs at the center?

(Short Answer)
4.8/5
(36)

A schedule chart depicts the loading and idle times for a group of machines or departments.

(True/False)
4.8/5
(35)

Which of the following is the last step in the capacity/scheduling chain?

(Multiple Choice)
4.8/5
(36)

If Eva uses the shortest processing time first (SPT) priority rule to schedule these jobs, what will be the average completion time?

(Multiple Choice)
4.8/5
(43)

Sequencing is concerned with the order in which jobs are done, while loading is concerned with assigning jobs to work centers or workstations.

(True/False)
4.8/5
(44)

The EDD priority rule usually does well with regard to _______.

(Multiple Choice)
4.9/5
(39)

If Eva uses the shortest processing time first (SPT) priority rule to schedule these jobs, what will be the average job tardiness?

(Multiple Choice)
4.9/5
(34)

Which sequencing rule is designed specifically to minimize job tardiness?

(Multiple Choice)
4.9/5
(34)

The SPT priority rule always results in the lowest average completion time.

(True/False)
4.8/5
(36)

Which of the following is not an assumption of priority rules?

(Multiple Choice)
4.9/5
(43)

"Flow-shop scheduling" is used in high volume systems.

(True/False)
4.8/5
(37)

Use Johnson's Rule to determine the optimum processing sequence for the jobs listed below.Chart total throughput time.

(Essay)
4.8/5
(38)
Showing 81 - 100 of 134
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)