Exam 16: Control Systems and Quality Management: Techniques for Enhancing Organizational Effectiveness

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

One way to improve productivity is to offer less flextime.

(True/False)
4.8/5
(47)

Installing quality-control procedures that can be audited by independent quality-control experts is fundamental to _____.

(Multiple Choice)
4.9/5
(33)

An external audit is a verification of an organization's financial accounts and statements by the organization's own professional staff.

(True/False)
4.8/5
(37)

A variable budget does not allow the allocation of resources to vary in proportion with various levels of activity.

(True/False)
4.8/5
(48)

Customer satisfaction and financial measures are two of four indicators of the balanced scorecard.

(True/False)
4.7/5
(33)

At Polar Sportswear, orders have significantly exceeded projections, and Chris, the operations director, has decided to hire for a third shift in the plant. Chris is clearly operating with the use of a(n) ______ budget.

(Multiple Choice)
4.9/5
(39)

What are the two core principles of TQM? Explain the assumptions underlying each.

(Essay)
4.7/5
(33)

Profits or losses incurred by an organization are represented in its _____.

(Multiple Choice)
4.8/5
(38)

Which of the following may be done as corrective action in the control process?

(Multiple Choice)
4.8/5
(27)

In Deming's PDCA cycle, "D" stands for "do," which means to implement the change or make a small-scale test.

(True/False)
4.7/5
(29)

A balance sheet summarizes an organization's overall financial worth, or its assets and liabilities, at a specific point in time.

(True/False)
4.9/5
(41)

The type of budget that can be adjusted over time for changing environmental conditions is known as a(n) ______ budget.

(Multiple Choice)
4.9/5
(42)

Oakley Lumber Mill formed a team to help the organization determine a course of action in the wake of a forest fire that temporarily closed access to its mountain satellite office. This is an example of a _____.

(Multiple Choice)
4.9/5
(32)

Six primary performance areas for measurement management include financial performance, operating efficiency, customer satisfaction, employee performance, innovation/change, and community/environment.

(True/False)
4.8/5
(38)

The ISO 9000 quality designation is accepted in over 100 countries around the world.

(True/False)
4.9/5
(39)

The acceptable deviation depends on the range of variation built into the standards when they were set.

(True/False)
4.8/5
(43)

At UPS, delivery ______ vary according to whether a route is urban, suburban, or rural in nature.

(Multiple Choice)
4.8/5
(26)

The singular task of internal auditors is to verify that the organization, in preparing its financial statements, followed generally accepted accounting principles.

(True/False)
4.9/5
(40)

The four management functions are planning, organizing, leading, and motivating.

(True/False)
4.8/5
(37)

Involving employees in both the planning and execution of control systems can bring legitimacy to the process and heighten employee morale.

(True/False)
4.9/5
(30)
Showing 81 - 100 of 160
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)