Exam 26: Simulation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A desirable feature of simulation software is which of the following?

(Multiple Choice)
4.8/5
(39)

Simulation models are classified as continuous if the simulation occurs at specific event points,like a piece of machinery in a factory breaking down.

(True/False)
4.8/5
(33)

A small company has either a good day of sales with an average of $50,000 or a bad day with an average of only $10,000 for the day.To simulate these outcomes,random numbers from 00 to 99 should be assigned with the intervals determined from the frequency distribution.If,during the last 50 days,that the vendor had 15 good days and 35 bad days,which of the following is a correct random number interval for a bad day?

(Multiple Choice)
4.8/5
(39)

As stated in the textbook,there are five different categories of probability distributions that can be used for a simulation study.

(True/False)
4.9/5
(35)

Simulation is used in manufacturing management to determine production schedules,inventory Levels and to do capacity planning.

(True/False)
4.8/5
(33)

Decision rules in a simulation are a set of conditions under which the behavior of the simulation model is observed.These rules are either directly or indirectly the focus of most simulation studies.

(True/False)
4.8/5
(37)

Having animation capabilities to graphically display product flows through a production system is not considered a desirable feature of simulation software systems.

(True/False)
4.8/5
(48)

Which of the following is a way of dealing with a validation problem when the computer simulation yields results that you suspect are incorrect?

(Multiple Choice)
4.9/5
(43)

In constructing a simulation model you decide that a particular property of the real system should be represented by a fixed number.What is that property called?

(Short Answer)
4.8/5
(38)

General-Purpose Simulation Software (GPSS)is really a computer language that allows programmers to build their own simulation models.

(True/False)
5.0/5
(38)

In a simulation model time cannot be advanced by variable time increments.

(True/False)
4.8/5
(43)

A key factor in the "construct simulation model" phase of a simulation study is which of the following?

(Multiple Choice)
4.9/5
(38)

When we have performed a simulation run of a model another simulation experiment might be called for that requires a change in parameters or variables.

(True/False)
4.8/5
(32)

Operations and supply management simulations are most usually the continuous type.

(True/False)
4.9/5
(40)
Showing 41 - 54 of 54
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)