Exam 25: Process Capability and Spc
Exam 1: Introduction to the Field59 Questions
Exam 2: Operations and Supply Strategy61 Questions
Exam 3: Project Management95 Questions
Exam 4: Product and Service Design53 Questions
Exam 5: Strategic Capacity Management52 Questions
Exam 6: Process Analysis50 Questions
Exam 7: Manufacturing Processes42 Questions
Exam 8: Service Processes59 Questions
Exam 9: Six Sigma Quality83 Questions
Exam 10: Supply-Chain Strategy67 Questions
Exam 11: Logistics and Facility Location56 Questions
Exam 12: Lean Manufacturing74 Questions
Exam 13: Operations Consulting Reengineering68 Questions
Exam 14: Enterprise Resource Planning Systems35 Questions
Exam 15: Demand Management and Forecasting105 Questions
Exam 16: Aggregate Sales and Operations Planning64 Questions
Exam 17: Inventory Control100 Questions
Exam 18: Material Requirements Planning111 Questions
Exam 19: Scheduling69 Questions
Exam 20: Constraint Management64 Questions
Exam 21: Linear Programming Using the Excel Solver40 Questions
Exam 22: Learning Curves57 Questions
Exam 23: Job Design Work Measurement61 Questions
Exam 24: Waiting Line Analysis61 Questions
Exam 25: Process Capability and Spc75 Questions
Exam 26: Simulation54 Questions
Select questions type
Total,one-hundred percent,inspection can never be cost justified.
(True/False)
4.7/5
(36)
You are developing an "X-bar" chart based on sample means.You know the standard deviation of the sample means is 4,the desired confidence level is 99 percent and the average of the sample means is 20.What is your LCL?
(Short Answer)
4.8/5
(50)
You want to develop a three-sigma "R" chart.You know the average range is 5 based on several samples of size 10.Which of the following is the resulting UCL?
(Multiple Choice)
4.9/5
(40)
If you are going to develop an "X-bar" chart based on range statistics and you are using a sample size of 12 for your charting purposes.Which of the following is the A2 factor for the "X-bar" chart?
(Multiple Choice)
4.9/5
(43)
The producer's risk associated with rejecting a high quality lot is denoted in acceptance sampling with the Greek letter beta.
(True/False)
4.9/5
(30)
Explain the difference between producer's risk and consumer's risk in acceptance sampling.
(Essay)
4.9/5
(43)
Quality control charts usually have a central line and upper and lower control limit lines.Which of the following is not a reason that the process being monitored with the chart should be investigated?
(Multiple Choice)
4.8/5
(37)
You want to determine the control lines for a "p" chart for quality control purposes.If the total number of defects from all samples is 560,the number of samples is 70 and the sample size is 80,what would be the standard deviation used in developing the control lines?
(Short Answer)
4.8/5
(27)
You have just used the capability index (Cpk)formulas to compute the two values "min [1.5,1]".Which of the following is the interpretation of these numbers?
(Multiple Choice)
4.8/5
(37)
The probability associated with accepting a low quality lot is denoted in acceptance sampling with the Greek letter alpha.
(True/False)
4.8/5
(35)
The probability associated with rejecting a high quality lot is denoted in acceptance sampling with the Greek letter alpha.
(True/False)
4.9/5
(37)
An example of assignable variation in a production system may be that workers are not identically trained.
(True/False)
5.0/5
(34)
Acceptance sampling is performed on goods that already exist to determine what percentage of items conforms to specifications.
(True/False)
4.9/5
(38)
You want to develop a three-sigma "R" chart.You know the average range is 12 based on several samples of size 6.Which of the following is the resulting LCL?
(Short Answer)
4.9/5
(42)
For which of the following should we use a "p" chart to monitor process quality?
(Multiple Choice)
4.7/5
(36)
The "p" chart is only useful for sampling that deals with continuous variables.
(True/False)
4.7/5
(31)
All else being equal,how large is the effect of lot size on sample size?
(Short Answer)
4.9/5
(40)
Sampling plans are generally displayed graphically through the use of operating characteristic (OC)curves.
(True/False)
4.9/5
(37)
Showing 41 - 60 of 75
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)