Maslow suggests that each level of the hierarchy of needs is not necessarily a prerequisite for the levels above.

Free
(True/False)
4.7/5
(39)
Correct Answer:
Verified

False

There are ____________________ main types of power,based on French and Raven's classic study,"The Bases of Social Power."

Free
(Short Answer)
4.7/5
(34)
Correct Answer:
Verified

five 5

If companies plan their projects well,they can avoid the need for overtime,or they can make it clear that overtime is optional.

Free
(True/False)
4.8/5
(41)
Correct Answer:
Verified

True

____ is a technique for resolving resource conflicts by delaying tasks.

(Multiple Choice)
4.9/5
(33)

Legitimate power involves using personal knowledge and expertise to get people to change their behavior.

(True/False)
4.9/5
(37)

Describe Maslow's hierarchy of needs.How does it relate to information technology projects?

(Essay)
4.9/5
(34)

____ is best known for developing a hierarchy of needs.

(Multiple Choice)
4.7/5
(32)

____ involves getting the needed personnel assigned to and working on the project.

(Multiple Choice)
4.7/5
(36)

People who believe in Theory Y assume that workers dislike and avoid work if possible,so managers must use coercion,threats,and various control schemes to get workers to make adequate efforts to meet objectives.

(True/False)
4.8/5
(40)

Team-building skills are often not a challenge for many project managers.

(True/False)
4.9/5
(22)

Extrinsic motivation causes people to participate in an activity for their own enjoyment.

(True/False)
4.8/5
(40)

Resource ____________________ aims to minimize period-by-period variations in resource loading by shifting tasks within their slack allowances.

(Short Answer)
4.7/5
(35)

The ___________________________________ is a popular tool for determining personality preferences.

(Short Answer)
4.8/5
(37)

Herzberg called factors that cause job satisfaction ____________________.

(Short Answer)
4.8/5
(44)

The first step in the framework for defining and assigning work is ____.

(Multiple Choice)
4.8/5
(32)

The main outputs of ____ process are team performance assessments and enterprise environmental factors updates.

(Multiple Choice)
4.7/5
(39)

____ is matching certain behaviors of the other person.

(Multiple Choice)
4.8/5
(30)

A responsibility assignment matrix (RAM)is a matrix that maps the work of the project as described in the OBS to the people responsible for performing the work as described in the WBS.

(True/False)
4.8/5
(42)

The bottom four needs in Maslow's structure are referred to as ____ needs.

(Multiple Choice)
4.8/5
(35)

____________________ is getting people to do things based on a position of authority.

(Short Answer)
4.9/5
(35)