Cost estimates that are based as a guideline on real numbers,or figures derived after the completion of preliminary design work,are:

(Multiple Choice)
4.8/5
(34)

Big Mike has to prepare a bid for the swimming pools to be placed in every backyard in a new housing addition.Each swimming pool represents only a slight variation on the other,so there is a good opportunity to leverage learning effects in the bid process.A swimming pool installation can be broken down into four major steps: excavation,concrete,plumbing,and finish work.Mike has found the best contractors and asks each of them how long it will take to complete work on the first pool and what their learning rates are.Amazingly,each contractor is intimately familiar with learning curve theory and knows what his learning rate is for this type of work.This information is summarized in the table. Function First Pool Learning Rate Excavation 22 hours 95 Concrete 32 hours 90 Plumbing 10 hours 85 Finishing 30 hours 85 How long will it take to complete the 25th pool for the subdivision? How long will it take to complete all 25 pools for the subdivision?

(Essay)
4.9/5
(41)
Showing 101 - 102 of 102
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)