Exam 6: Statistical Quality Control
Exam 1: Introduction to Operations Management133 Questions
Exam 2: Operations Strategy and Competitiveness134 Questions
Exam 3: Product Design and Process Selection131 Questions
Exam 4: Supply Chain Management132 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control132 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting136 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout130 Questions
Exam 11: Work System Design133 Questions
Exam 12: Inventory Management135 Questions
Exam 13: Aggregate Planning103 Questions
Exam 14: Resource Planning137 Questions
Exam 15: Scheduling135 Questions
Exam 16: Project Management136 Questions
Exam 17: Spreadsheet Modeling: An Introduction136 Questions
Exam 18: Introduction to Optimization130 Questions
Exam 19: Waiting Line Models130 Questions
Exam 20: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
The person that comes from the top ranks of the organization and is responsible for providing direction and overseeing all aspects of a six-sigma implementation process is called a ________________________.
(Multiple Choice)
4.9/5
(31)
Upper and lower control limits are usually set at 6 standard deviations from the mean.
(True/False)
4.8/5
(39)
The probability of shipping a lot or batch of products whose proportion of defective items is greater than LTPD is called consumer's risk because ______________________.
(Short Answer)
4.9/5
(29)
What is the probability of a Type I error for a control chart with limits set at 3 standard deviations from the mean?
(Multiple Choice)
4.9/5
(30)
The standard deviation measures the difference between the largest and smallest observations in a set of data.
(True/False)
4.8/5
(47)
What is a graph that shows the probability or chance of accepting a lot given various proportions of defects in the lot?
(Multiple Choice)
4.9/5
(45)
Setting up control charts to monitor whether a process is in control
(Multiple Choice)
4.9/5
(31)
The Six Sigma approach is organized around a _______ plan known as ________.
(Multiple Choice)
4.7/5
(29)
What is a control chart that monitors the proportion of defects in a sample?
(Multiple Choice)
4.8/5
(37)
In six-sigma programs, individuals are given __________________ titles that reflect their skills in the six-sigma process.
(Multiple Choice)
4.8/5
(37)
On a control chart, what separates common from assignable causes of variation?
(Multiple Choice)
4.9/5
(40)
A p-chart is used when we can compute only the number of defects but not the total sample size.
(True/False)
4.9/5
(38)
Increasing the number of standard deviations on which control chart limits are based will decrease the Type I error.
(True/False)
4.8/5
(38)
A small range and large standard deviation imply that data observations are closely clustered around the mean.
(True/False)
4.8/5
(35)
Showing 81 - 100 of 132
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)