Exam 6: Statistical Quality Control
Exam 1: Introduction to Operations Management133 Questions
Exam 2: Operations Strategy and Competitiveness134 Questions
Exam 3: Product Design and Process Selection131 Questions
Exam 4: Supply Chain Management132 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control132 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting136 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout130 Questions
Exam 11: Work System Design133 Questions
Exam 12: Inventory Management135 Questions
Exam 13: Aggregate Planning103 Questions
Exam 14: Resource Planning137 Questions
Exam 15: Scheduling135 Questions
Exam 16: Project Management136 Questions
Exam 17: Spreadsheet Modeling: An Introduction136 Questions
Exam 18: Introduction to Optimization130 Questions
Exam 19: Waiting Line Models130 Questions
Exam 20: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
What is a control chart that monitors changes in the mean value of a process?
(Multiple Choice)
4.8/5
(36)
Which of the following is not associated with descriptive statistics?
(Multiple Choice)
4.9/5
(42)
What is the upper control limit for a c-chart if the total defects found over 20 samples equals 150?
(Multiple Choice)
4.7/5
(43)
If the average range is 4.0 inches and the sample size is 18, compute the upper and lower limits for an R chart.
(Essay)
4.8/5
(39)
What is the lower control limit for a c-chart if the average number of defects found over 320 samples is equal to 16?
(Multiple Choice)
4.9/5
(31)
Compute the Cpk measure of process capability for the following machine and interpret the findings. What value would you have obtained with the Cp measure?
Upper spec limit = 100 feet
Lower spec limit = 99.5 feet
Process ? = 99.8 feet
Process ? = .08 feet
(Short Answer)
4.7/5
(48)
According to the text, what percent of defects are consumers generally willing to accept?
(Multiple Choice)
4.8/5
(41)
Suppose that Matt wants to use a process control chart to monitor the number of different types of mistakes that he makes when giving motivational speeches to student groups. Which control chart would be most appropriate?
(Multiple Choice)
4.9/5
(29)
Suppose that you have created control charts to measure the length of candles. The process is in a state of control if either the x-bar chart is in control or the R-chart is in control.
(True/False)
4.8/5
(43)
The computed AOQ provides a sense of the ______________ of the product
(Short Answer)
4.8/5
(44)
The person that comes from the top ranks of the organization and is responsible for providing direction and overseeing all aspects of a six-sigma implementation process is called a general.
(True/False)
4.8/5
(37)
What process width is typically used when computing the process capability index Cp?
(Multiple Choice)
4.9/5
(37)
What process capability index (Cp) value implies that the process "exceeds minimal capability?"
(Multiple Choice)
4.9/5
(36)
Showing 101 - 120 of 132
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)