Exam 7: Just-In-Time and Lean Systems
Exam 1: Introduction to Operations Management133 Questions
Exam 2: Operations Strategy and Competitiveness134 Questions
Exam 3: Product Design and Process Selection131 Questions
Exam 4: Supply Chain Management132 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control132 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting136 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout130 Questions
Exam 11: Work System Design133 Questions
Exam 12: Inventory Management135 Questions
Exam 13: Aggregate Planning103 Questions
Exam 14: Resource Planning137 Questions
Exam 15: Scheduling135 Questions
Exam 16: Project Management136 Questions
Exam 17: Spreadsheet Modeling: An Introduction136 Questions
Exam 18: Introduction to Optimization130 Questions
Exam 19: Waiting Line Models130 Questions
Exam 20: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
Undercapacity scheduling is the term that describes working with a schedule of seven hours of production and one hour of problem solving with teams.
(True/False)
4.8/5
(32)
Consider a workstation that can process 4 units per minute. It takes 2 hours to receive an order from the previous station. The container size is 10 units. The factory sets safety stock at 20 percent of demand during lead time. How many kanbans are needed for the workstation?
(Short Answer)
4.9/5
(41)
Kaizen is a Japanese term referring to __________________________.
(Multiple Choice)
4.9/5
(33)
Being able to keep costs low while changing the volume of production is an example of
(Multiple Choice)
4.8/5
(38)
Consider a workstation that can process 4000 units per hour. It takes 15 minutes to receive an order from the previous station. The container size is 20 units. The factory sets safety stock at 20 percent of demand during lead time. How many kanbans are needed for the workstation?
(Multiple Choice)
4.8/5
(40)
The advantages of cell manufacturing using a U-shaped cell include all of the following except
(Multiple Choice)
4.7/5
(34)
JIT supply chains often involve firms that _____________________.
(Short Answer)
4.9/5
(30)
JIT uses a pull system where communication starts with either the customer or with the _________ work station in the production line.
(Multiple Choice)
4.8/5
(30)
JIT relies on a ______ that withdraws parts for a previous work cell and moves them to the next.
(Multiple Choice)
4.8/5
(39)
Frank James works for a production facility that makes car radios. His job is to insert the integrated circuits and make sure that they work correctly. He is expected to handle 20 radios per hour. The factory uses a Kanban production system with containers that hold four radios. It takes 60 minutes for Frank to receive the radios from the previous work station. How many Kanbans are needed?
(Short Answer)
4.8/5
(39)
A key outcome of JIT is that organizational barriers are eliminated.
(True/False)
4.8/5
(41)
In making specific changes to JIT manufacturing, which of the following steps should come first?
(Multiple Choice)
4.8/5
(28)
What is the term for an adjustment of a machine after making one product type so that production can begin for another product type?
(Multiple Choice)
4.8/5
(35)