Exam 7: Just-In-Time and Lean Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

One of the greatest benefits of JIT would be

(Multiple Choice)
4.8/5
(35)

Undercapacity scheduling is the term that describes working with a schedule of seven hours of production and one hour of problem solving with teams.

(True/False)
4.8/5
(32)

Consider a workstation that can process 4 units per minute. It takes 2 hours to receive an order from the previous station. The container size is 10 units. The factory sets safety stock at 20 percent of demand during lead time. How many kanbans are needed for the workstation?

(Short Answer)
4.9/5
(41)

Kaizen is a Japanese term referring to __________________________.

(Multiple Choice)
4.9/5
(33)

JIT is often mistakenly assumed to

(Multiple Choice)
4.9/5
(39)

Being able to keep costs low while changing the volume of production is an example of

(Multiple Choice)
4.8/5
(38)

JIT considers waste anything that

(Multiple Choice)
4.9/5
(39)

Consider a workstation that can process 4000 units per hour. It takes 15 minutes to receive an order from the previous station. The container size is 20 units. The factory sets safety stock at 20 percent of demand during lead time. How many kanbans are needed for the workstation?

(Multiple Choice)
4.8/5
(40)

With regard to suppliers, JIT typically requires

(Multiple Choice)
4.8/5
(41)

The advantages of cell manufacturing using a U-shaped cell include all of the following except

(Multiple Choice)
4.7/5
(34)

JIT supply chains often involve firms that _____________________.

(Short Answer)
4.9/5
(30)

JIT uses a pull system where communication starts with either the customer or with the _________ work station in the production line.

(Multiple Choice)
4.8/5
(30)

The manufacturing process in JIT starts with the

(Multiple Choice)
4.8/5
(36)

What JIT concepts are applicable to service organizations?

(Essay)
4.8/5
(35)

JIT relies on a ______ that withdraws parts for a previous work cell and moves them to the next.

(Multiple Choice)
4.8/5
(39)

Frank James works for a production facility that makes car radios. His job is to insert the integrated circuits and make sure that they work correctly. He is expected to handle 20 radios per hour. The factory uses a Kanban production system with containers that hold four radios. It takes 60 minutes for Frank to receive the radios from the previous work station. How many Kanbans are needed?

(Short Answer)
4.8/5
(39)

A key outcome of JIT is that organizational barriers are eliminated.

(True/False)
4.8/5
(41)

Poka-yoke means

(Multiple Choice)
4.9/5
(32)

In making specific changes to JIT manufacturing, which of the following steps should come first?

(Multiple Choice)
4.8/5
(28)

What is the term for an adjustment of a machine after making one product type so that production can begin for another product type?

(Multiple Choice)
4.8/5
(35)
Showing 101 - 120 of 137
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)