Exam 7: Just-In-Time and Lean Systems
Exam 1: Introduction to Operations Management133 Questions
Exam 2: Operations Strategy and Competitiveness134 Questions
Exam 3: Product Design and Process Selection131 Questions
Exam 4: Supply Chain Management132 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control132 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting136 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout130 Questions
Exam 11: Work System Design133 Questions
Exam 12: Inventory Management135 Questions
Exam 13: Aggregate Planning103 Questions
Exam 14: Resource Planning137 Questions
Exam 15: Scheduling135 Questions
Exam 16: Project Management136 Questions
Exam 17: Spreadsheet Modeling: An Introduction136 Questions
Exam 18: Introduction to Optimization130 Questions
Exam 19: Waiting Line Models130 Questions
Exam 20: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
An improvement tool that utilizes cross-functional teams to plan and deliver improvements to specific processes during two- or three-day marathon sessions is called a kanban blitz.
(True/False)
4.8/5
(35)
Without kanbans, the withdrawal and production of materials
(Multiple Choice)
4.9/5
(44)
Consider a workstation that can process 1200 units per hour. It takes 1.5 hours to receive an order from the previous station. The container size is 40 units. The factory sets safety stock at 20 percent of demand during lead time. How many kanbans are needed for the workstation?
(Short Answer)
4.8/5
(33)
Quality in just-in-time is centered on building quality into the
(Multiple Choice)
4.9/5
(32)
Consider a workstation that can process 400 units per hour. It takes 3 hours to receive an order from the previous station. The container size is 50 units. The factory sets safety stock at 10 percent of demand during lead time. How many kanbans are needed for the workstation?
(Short Answer)
4.8/5
(34)
The manufacturing process in JIT starts with the final assembly schedule.
(True/False)
4.9/5
(36)
What is the term that means giving workers authority to stop the production line when quality problems are encountered?
(Multiple Choice)
4.8/5
(47)
According to JIT, by eliminating inventory we can clearly identify __________ and work on eliminating them.
(Multiple Choice)
4.9/5
(32)
The principles of JIT need to be adopted by all members of a supply chain in order to have a __________.
(Short Answer)
4.7/5
(41)
Which of the following is characteristic of the JIT philosophy?
(Multiple Choice)
4.8/5
(30)
Consider a workstation that can process 1060 units per hour. It takes 15 minutes to receive an order from the previous station. The container size is 20 units. The factory sets safety stock at 20 percent of demand during lead time. How many kanbans are needed for the workstation?
(Short Answer)
4.8/5
(38)
There are two types of Kanban cards, production Kanban and withdrawal Kanban.
(True/False)
4.8/5
(44)
Something you would not expect to see in a just-in-time work environment is
(Multiple Choice)
4.9/5
(42)
The benefits of long-term relationships with a small number of suppliers include all of the following except
(Multiple Choice)
4.8/5
(32)