An increase in the number of cultures with which a project team must interface, and not the number of cultures represented on the team, increases the complexity of a project.

Free
(True/False)
4.8/5
(38)
Correct Answer:
Verified

False

The more time and energy the management team must dedicate to searching for resources or alternatives places, the lesser is the stress on the project.

Free
(True/False)
4.8/5
(32)
Correct Answer:
Verified

False

A _____ is a method of incorporating change into project planning and execution processes.

Free
(Multiple Choice)
4.9/5
(28)
Correct Answer:
Verified

B

Which among the following is an example of an ordered system?

(Multiple Choice)
4.9/5
(34)

All projects experience a degree of environmental turbulence, yet not all projects experience a form of environment shift during the life of the project.

(True/False)
4.8/5
(32)

This defines what is inside the project and what is outside.

(Multiple Choice)
4.8/5
(32)

Formal organizational charts indicate reporting relationships and are very effective at displaying project relationships.

(True/False)
4.8/5
(35)

Goal-based cultures:

(Multiple Choice)
4.8/5
(39)

_____ refers to the classification or profiling of items that have characteristics or traits in common.

(Short Answer)
4.9/5
(35)

The term _____ is defined as the characteristic of an entity or object.

(Short Answer)
4.8/5
(33)

Project profiling places a project into a category with other projects that have similar characteristics.

(True/False)
4.8/5
(34)

According to the Darnall-Preston Complexity Index DPCI), which of the following are external attributes that contribute to project complexity?

(Multiple Choice)
4.8/5
(32)

Shenhar and Dvir observed that the project execution approach was connected to the project type.

(True/False)
4.7/5
(31)

In addition to the number of parts, the degree of differentiation between parts and _____ also influences the degree of complexity in system.

(Multiple Choice)
4.8/5
(35)

Briefly describe the typology developed by Shenhar and Dvir.

(Essay)
4.9/5
(31)

_____ is a term that reflects the community's assumptions, norms, values, and artifacts.

(Multiple Choice)
4.9/5
(30)

The client team approach of handling projects adds to project complexity.

(True/False)
4.7/5
(34)

Define project profiling.

(Short Answer)
4.7/5
(30)

The DPCI was developed around four assumptions. Which of the following is one of them?

(Multiple Choice)
4.7/5
(32)

_____ identified differences in project types based on uncertainty and risk, level of sophistication of the workers, the level of detail in the planning, the newness of the technology, and the time pressure.

(Multiple Choice)
4.9/5
(31)