Exam 2: Project Profiling

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following are the technological attributes that contribute to project complexity?

(Multiple Choice)
4.8/5
(40)

An) _____ is defined as an organization of elements that change in response to events in its environment.

(Multiple Choice)
4.9/5
(39)

According to Shenhar and Dvir, as the project system scope became more complex and the system scope of the project became larger:

(Multiple Choice)
4.8/5
(41)

In terms of stakeholder agreement, which of the following does NOT increase the complexity of a project?

(Multiple Choice)
4.9/5
(37)

Which of the following statements is true about project size as an external attribute that contributes to project complexity?

(Multiple Choice)
4.7/5
(43)

Projects are complex adaptive systems. Explain.

(Essay)
4.9/5
(39)

_____ cultures promote assuming risk to achieve goals.

(Short Answer)
4.8/5
(45)

As per the typology developed by Shenhar and Dvir, system scope ranged from _____ that included projects that dealt with building a single component, to _____ that included a wide dispersal of interactive systems and subsystems.

(Multiple Choice)
4.9/5
(39)

_____ refers) to activities that are affected by events that change the characteristics of other activities.

(Multiple Choice)
4.8/5
(42)

_____ is the process of extracting a characterization from the known attributes of a project.

(Multiple Choice)
4.8/5
(42)

Duties for equipment and material brought into a country add complexity to the procurement plan.

(True/False)
4.8/5
(41)

Shenhar and Dvir develop criteria for each type of technological uncertainty that enabled the project to be typed.

(True/False)
4.8/5
(30)

The technology of a project refers to the technology used to manage the project.

(True/False)
4.8/5
(42)

In Shenhar and Dvir's typology, technological uncertainty ranged from low tech and medium tech, to high tech.

(True/False)
4.8/5
(30)

Youker looked at system scope as an attribute that helped determine a project profile.

(True/False)
4.8/5
(37)

A _____ system is a system that will produce the same results if you start with the same conditions.

(Multiple Choice)
4.9/5
(33)

Which of the following statements is true about project profiling?

(Multiple Choice)
4.9/5
(38)

The _____ Index is a project profiling system that groups project attributes into four categories: internal attributes, external attributes, technological complexity, and ecological attributes.

(Short Answer)
4.9/5
(38)

Briefly describe the four categories of the Darnall-Preston Complexity Index DPCI).

(Essay)
4.8/5
(29)

Which of the following statements is NOT true about project duration as an external attribute that contributes to project complexity?

(Multiple Choice)
4.7/5
(38)
Showing 21 - 40 of 68
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)