Exam 8: Capacity and Constraint Management
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality123 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Capacity and Constraint Management96 Questions
Exam 9: Location Strategies120 Questions
Exam 10: Layout Strategies146 Questions
Exam 11: Human Resources, job Design, and Work Measurement154 Questions
Exam 12: Supply Chain Management144 Questions
Exam 13: Inventory Management163 Questions
Exam 14: Aggregate Planning and Sop116 Questions
Exam 15: Material Requirements Planning Mrpand Erp113 Questions
Exam 16: Short-Term Scheduling116 Questions
Exam 17: Jit, tps, and Lean Operations115 Questions
Exam 18: Maintenance and Reliability111 Questions
Exam 19: Sustainability in the Supply Chain80 Questions
Exam 20: Statistical Process Control144 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools97 Questions
Exam 23: Linear Programming80 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves105 Questions
Exam 27: Simulation75 Questions
Select questions type
The theory of constraints has its origins in:
Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
E
One limitation of the net present value approach to investments is that investments with identical net present values may have very different cash flows.
Free
(True/False)
4.9/5
(32)
Correct Answer:
True
The Academic Computing Center has five trainers available in its computer labs to provide training sessions to students.Assume that the design capacity of the system is 1900 students per semester and that effective capacity equals 90% of design capacity.If the number of students who actually got their orientation session is 1500,what is the efficiency of the system?
(Multiple Choice)
4.9/5
(40)
The basic break-even model can be modified to handle more than one product.This extension of the basic model requires:
(Multiple Choice)
4.8/5
(38)
A work system has five stations that have process times of 5,9,4,9,and 8.What is the throughput time of the system?
(Multiple Choice)
4.8/5
(37)
Break-even analysis is a powerful analytical tool,but is useful only when the organization produces a single product.
(True/False)
4.8/5
(34)
A factory produces 1000 units a month.If design capacity is 3000 and efficiency is 50% find utilization and effective capacity.
(Essay)
4.9/5
(32)
An assembly line has 10 stations with times of 1,2,3,4,…,10,respectively.What is the bottleneck time?
(Multiple Choice)
4.8/5
(40)
The capacity planning strategy that delays adding capacity until capacity is below demand,then adds a capacity increment so that capacity is above demand,is said to ________ demand.
(Short Answer)
4.8/5
(43)
The net present value of $10,000 to be received in exactly three years is considerably greater than $10,000.
(True/False)
4.8/5
(30)
________ analysis finds the point at which costs equal revenues.
(Short Answer)
5.0/5
(36)
A new machine tool is expected to generate receipts as follows: $5,000 in year one; $3,000 in year two,nothing in the next year,and $2,000 in the fourth year.At an interest rate of 6%,what is the net present value of these receipts? Is this a better net present value than $2,500 each year over four years? Explain.
(Essay)
4.8/5
(28)
An executive conference center has the physical ability to handle 1,100 participants.However,conference management personnel believe that only 1,000 participants can be handled effectively for most events.The last event,although forecasted to have 1,000 participants,resulted in the attendance of only 950 participants.What are the utilization and efficiency of the conference facility?
(Essay)
4.8/5
(27)