DRP is a time-phased stock-replenishment plan for all levels of a distribution network.

Free
(True/False)
4.9/5
(37)
Correct Answer:
Verified

True

Consider the following product structure. Consider the following product structure.   If the demand for product A is 50 units,how many units of component E will be needed? If the demand for product A is 50 units,how many units of component E will be needed?

Free
(Multiple Choice)
5.0/5
(34)
Correct Answer:
Verified

E

What information is necessary for an operations manager to make effective use of a dependent inventory demand model?

Free
(Essay)
4.8/5
(40)
Correct Answer:
Verified

(1)Master production schedule (what is to be made,and when); (2)Specifications or bill of material (materials and parts required to make the product); (3)Inventory availability (what is in stock); (4)Purchase orders outstanding (what is on order,also called expected receipts); and (5)Lead times (how long does it takes to get various components)

Gross material requirements do not take into account the amount of inventory on hand.

(True/False)
4.8/5
(37)

What does the POQ interval equal?

(Multiple Choice)
4.8/5
(34)

Time fences divide that segment of the master schedule that can be revised from that section that is "not to be rescheduled."

(True/False)
4.7/5
(32)

For the lot-sizing technique known as lot-for-lot to be appropriate:

(Multiple Choice)
4.9/5
(42)

Explain the difference between a gross requirements plan and a net requirements plan.

(Essay)
4.7/5
(33)

Effective use of MRP and other dependent demand models does not require which of the following?

(Multiple Choice)
4.7/5
(40)

Describe the role of record accuracy in Wheeled Coach's successful use of MRP.

(Essay)
4.8/5
(36)

Planning bills of material are bills of material for "kits" of inexpensive items such as washers,nuts,and bolts.

(True/False)
4.8/5
(40)

Which of the following best describes a gross material requirements plan?

(Multiple Choice)
4.8/5
(32)

What is DRP?

(Essay)
4.7/5
(27)

________ are the result of adjusting gross requirements for inventory on hand and scheduled receipts.

(Essay)
4.8/5
(37)

A(n)________ system is packaged business software that automates and integrates the majority of business processes,shares common data and practices across the entire enterprise,and produces information in a real-time environment.

(Short Answer)
4.9/5
(31)

An order for 110 units of Product A has been placed.There are currently 60 units of Product A on hand.Each A requires 4 units of Part B.There are 20 units of B available.What are the net requirements for B?

(Multiple Choice)
4.8/5
(26)

What is the process of tracing upward in the bill of material from the component to the parent item in order to determine the cause for the component requirement?

(Multiple Choice)
4.9/5
(35)

Which of the following is TRUE regarding the POQ lot-sizing method?

(Multiple Choice)
4.9/5
(38)

A dependent demand item is so called because its demand is dependent on customer preferences.

(True/False)
4.8/5
(35)

When safety stock is deemed absolutely necessary,the usual policy is to build it into (increase)the inventory requirement of the MRP logic.

(True/False)
4.8/5
(26)
Showing 1 - 20 of 113