Exam 15: Material Requirements Planning Mrpand Erp
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality123 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Capacity and Constraint Management96 Questions
Exam 9: Location Strategies120 Questions
Exam 10: Layout Strategies146 Questions
Exam 11: Human Resources, job Design, and Work Measurement154 Questions
Exam 12: Supply Chain Management144 Questions
Exam 13: Inventory Management163 Questions
Exam 14: Aggregate Planning and Sop116 Questions
Exam 15: Material Requirements Planning Mrpand Erp113 Questions
Exam 16: Short-Term Scheduling116 Questions
Exam 17: Jit, tps, and Lean Operations115 Questions
Exam 18: Maintenance and Reliability111 Questions
Exam 19: Sustainability in the Supply Chain80 Questions
Exam 20: Statistical Process Control144 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools97 Questions
Exam 23: Linear Programming80 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves105 Questions
Exam 27: Simulation75 Questions
Select questions type
DRP is a time-phased stock-replenishment plan for all levels of a distribution network.
Free
(True/False)
4.9/5
(37)
Correct Answer:
True
Consider the following product structure.
If the demand for product A is 50 units,how many units of component E will be needed?

Free
(Multiple Choice)
5.0/5
(34)
Correct Answer:
E
What information is necessary for an operations manager to make effective use of a dependent inventory demand model?
Free
(Essay)
4.8/5
(40)
Correct Answer:
(1)Master production schedule (what is to be made,and when); (2)Specifications or bill of material (materials and parts required to make the product); (3)Inventory availability (what is in stock); (4)Purchase orders outstanding (what is on order,also called expected receipts); and (5)Lead times (how long does it takes to get various components)
Gross material requirements do not take into account the amount of inventory on hand.
(True/False)
4.8/5
(37)
Time fences divide that segment of the master schedule that can be revised from that section that is "not to be rescheduled."
(True/False)
4.7/5
(32)
For the lot-sizing technique known as lot-for-lot to be appropriate:
(Multiple Choice)
4.9/5
(42)
Explain the difference between a gross requirements plan and a net requirements plan.
(Essay)
4.7/5
(33)
Effective use of MRP and other dependent demand models does not require which of the following?
(Multiple Choice)
4.7/5
(40)
Describe the role of record accuracy in Wheeled Coach's successful use of MRP.
(Essay)
4.8/5
(36)
Planning bills of material are bills of material for "kits" of inexpensive items such as washers,nuts,and bolts.
(True/False)
4.8/5
(40)
Which of the following best describes a gross material requirements plan?
(Multiple Choice)
4.8/5
(32)
________ are the result of adjusting gross requirements for inventory on hand and scheduled receipts.
(Essay)
4.8/5
(37)
A(n)________ system is packaged business software that automates and integrates the majority of business processes,shares common data and practices across the entire enterprise,and produces information in a real-time environment.
(Short Answer)
4.9/5
(31)
An order for 110 units of Product A has been placed.There are currently 60 units of Product A on hand.Each A requires 4 units of Part B.There are 20 units of B available.What are the net requirements for B?
(Multiple Choice)
4.8/5
(26)
What is the process of tracing upward in the bill of material from the component to the parent item in order to determine the cause for the component requirement?
(Multiple Choice)
4.9/5
(35)
Which of the following is TRUE regarding the POQ lot-sizing method?
(Multiple Choice)
4.9/5
(38)
A dependent demand item is so called because its demand is dependent on customer preferences.
(True/False)
4.8/5
(35)
When safety stock is deemed absolutely necessary,the usual policy is to build it into (increase)the inventory requirement of the MRP logic.