Exam 10: Layout Strategies

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

If the schedule calls for the production of 120 units per day and 480 minutes of production time are available per day,the cycle time would be 4 minutes.

Free
(True/False)
4.8/5
(39)
Correct Answer:
Verified

True

A focused work center is well suited to the production of a large family of products requiring similar processing,even if their demands are not very stable.

Free
(True/False)
4.9/5
(35)
Correct Answer:
Verified

False

A good layout requires determining:

Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
Verified

E

Which of the following is one of the main advantages of a product-oriented layout?

(Multiple Choice)
4.8/5
(28)

ASRS stands for which of the following?

(Multiple Choice)
4.8/5
(26)

Identify the five common layout heuristics used to assign tasks to workstations in assembly-line balancing.

(Essay)
4.8/5
(34)

A production line is to be designed to make 500 El-More dolls per day.Each doll requires 11 activities totaling 16 minutes of work.The factory operates 750 minutes per day.What is the required cycle time for this assembly line?

(Multiple Choice)
4.9/5
(36)

One of the major advantages of process-oriented layouts is:

(Multiple Choice)
4.9/5
(39)

The central problem in product-oriented layout planning is:

(Multiple Choice)
4.8/5
(32)

The dominant problem associated with the fixed-position layout is that workers are fixed in position,and they cannot be reassigned.

(True/False)
4.8/5
(34)

Which of the following is a common heuristic for assembly line balancing?

(Multiple Choice)
4.8/5
(33)

The project remains in one place and workers and equipment come to that one work area in a(n)________ layout.

(Short Answer)
4.8/5
(37)

________ is the maximum time that the product is allowed at each workstation.

(Short Answer)
4.8/5
(36)

Which type of layout features departments or other functional groupings in which similar activities are performed?

(Multiple Choice)
4.9/5
(39)

Process-oriented layouts typically have low levels of work-in-process inventory.

(True/False)
4.8/5
(35)

Which of the following is NOT a retail layout practice?

(Multiple Choice)
4.8/5
(30)

Solving a load-distance problem for a process-oriented layout requires that:

(Multiple Choice)
4.8/5
(33)

The objective of layout strategy is to develop an effective and efficient layout that will meet the firm's competitive requirements.

(True/False)
4.8/5
(36)

Cross-docking processes items as they are received,rather than placing them in storage.

(True/False)
4.8/5
(41)

A work cell is required to make 80 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours are available for productive work.These assemblies require five operations,with times of 1.0,1.8,2.4,2.5,and 1.4 minutes each.(a)What is takt time for this cell? (b)How many workers will be needed?

(Essay)
4.9/5
(29)
Showing 1 - 20 of 146
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)