Exam 10: Layout Strategies
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality123 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Capacity and Constraint Management96 Questions
Exam 9: Location Strategies120 Questions
Exam 10: Layout Strategies146 Questions
Exam 11: Human Resources, job Design, and Work Measurement154 Questions
Exam 12: Supply Chain Management144 Questions
Exam 13: Inventory Management163 Questions
Exam 14: Aggregate Planning and Sop116 Questions
Exam 15: Material Requirements Planning Mrpand Erp113 Questions
Exam 16: Short-Term Scheduling116 Questions
Exam 17: Jit, tps, and Lean Operations115 Questions
Exam 18: Maintenance and Reliability111 Questions
Exam 19: Sustainability in the Supply Chain80 Questions
Exam 20: Statistical Process Control144 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools97 Questions
Exam 23: Linear Programming80 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves105 Questions
Exam 27: Simulation75 Questions
Select questions type
If the schedule calls for the production of 120 units per day and 480 minutes of production time are available per day,the cycle time would be 4 minutes.
Free
(True/False)
4.8/5
(39)
Correct Answer:
True
A focused work center is well suited to the production of a large family of products requiring similar processing,even if their demands are not very stable.
Free
(True/False)
4.9/5
(35)
Correct Answer:
False
Which of the following is one of the main advantages of a product-oriented layout?
(Multiple Choice)
4.8/5
(28)
Identify the five common layout heuristics used to assign tasks to workstations in assembly-line balancing.
(Essay)
4.8/5
(34)
A production line is to be designed to make 500 El-More dolls per day.Each doll requires 11 activities totaling 16 minutes of work.The factory operates 750 minutes per day.What is the required cycle time for this assembly line?
(Multiple Choice)
4.9/5
(36)
The dominant problem associated with the fixed-position layout is that workers are fixed in position,and they cannot be reassigned.
(True/False)
4.8/5
(34)
Which of the following is a common heuristic for assembly line balancing?
(Multiple Choice)
4.8/5
(33)
The project remains in one place and workers and equipment come to that one work area in a(n)________ layout.
(Short Answer)
4.8/5
(37)
________ is the maximum time that the product is allowed at each workstation.
(Short Answer)
4.8/5
(36)
Which type of layout features departments or other functional groupings in which similar activities are performed?
(Multiple Choice)
4.9/5
(39)
Process-oriented layouts typically have low levels of work-in-process inventory.
(True/False)
4.8/5
(35)
Solving a load-distance problem for a process-oriented layout requires that:
(Multiple Choice)
4.8/5
(33)
The objective of layout strategy is to develop an effective and efficient layout that will meet the firm's competitive requirements.
(True/False)
4.8/5
(36)
Cross-docking processes items as they are received,rather than placing them in storage.
(True/False)
4.8/5
(41)
A work cell is required to make 80 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours are available for productive work.These assemblies require five operations,with times of 1.0,1.8,2.4,2.5,and 1.4 minutes each.(a)What is takt time for this cell? (b)How many workers will be needed?
(Essay)
4.9/5
(29)
Showing 1 - 20 of 146
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)