Exam 7: Lean Thinking and Lean Systems
Exam 1: The Operations Function25 Questions
Exam 2: Operations and Supply Chain Strategy26 Questions
Exam 3: Product Design27 Questions
Exam 4: Process Selection35 Questions
Exam 5: Service Process Design30 Questions
Exam 6: Process-Flow Analysis27 Questions
Exam 7: Lean Thinking and Lean Systems33 Questions
Exam 8: Managing Quality31 Questions
Exam 9: Quality Control and Improvement36 Questions
Exam 10: Supply Chain Management29 Questions
Exam 11: Forecasting31 Questions
Exam 12: Capacity Planning23 Questions
Exam 13: Scheduling Operations23 Questions
Exam 14: Project Planning and Scheduling22 Questions
Exam 15: Independent Demand Inventory30 Questions
Exam 16: Materials Requirements Planning and ERP30 Questions
Select questions type
According to the lean philosophy,it is required to maintain a stable master production schedule to reduce the work-in-process inventories.
(True/False)
4.9/5
(37)
Value stream maps are similar to flowcharts and are used for identifying the waste and non-value-added steps in the current process.
(True/False)
4.9/5
(28)
Reduction of setup time is accomplished by separating internal and external setups and:
(Multiple Choice)
5.0/5
(26)
If it takes 100 minutes to complete a circuit,demand at the next work center is 5 parts per minute,and a container will hold 20 parts,how many containers are required?
(Multiple Choice)
4.7/5
(29)
With lean thinking,a company's operations layout should evolve to a cellular manufacturing layout.
(True/False)
4.9/5
(33)
If a work center has no empty containers,the workers at the work center will do which of the following?
(Multiple Choice)
4.9/5
(37)
Showing 21 - 33 of 33
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)