Exam 7: Lean Thinking and Lean Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

According to the lean philosophy,it is required to maintain a stable master production schedule to reduce the work-in-process inventories.

(True/False)
4.9/5
(37)

A kanban card is used to signal that:

(Multiple Choice)
4.9/5
(38)

Value stream maps are similar to flowcharts and are used for identifying the waste and non-value-added steps in the current process.

(True/False)
4.9/5
(28)

External setup time refers to:

(Multiple Choice)
4.8/5
(32)

Reduction of setup time is accomplished by separating internal and external setups and:

(Multiple Choice)
5.0/5
(26)

The ideal lot size for a lean system is:

(Multiple Choice)
4.9/5
(34)

If it takes 100 minutes to complete a circuit,demand at the next work center is 5 parts per minute,and a container will hold 20 parts,how many containers are required?

(Multiple Choice)
4.7/5
(29)

With lean thinking,a company's operations layout should evolve to a cellular manufacturing layout.

(True/False)
4.9/5
(33)

If a work center has no empty containers,the workers at the work center will do which of the following?

(Multiple Choice)
4.9/5
(37)

Which of the following is not an element of lean?

(Multiple Choice)
4.9/5
(41)

Which of the following is not required for a lean system?

(Multiple Choice)
4.9/5
(36)

With regards to suppliers,lean systems typically require:

(Multiple Choice)
4.9/5
(35)

Why is production leveled in a lean system?

(Multiple Choice)
4.8/5
(34)
Showing 21 - 33 of 33
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)