Construct a cause-and-effect diagram for why students arrive to class late.Include at least three reasons for each of the Ms. Construct a cause-and-effect diagram for why students arrive to class late.Include at least three reasons for each of the Ms.

Free
(Essay)
4.7/5
(29)
Correct Answer:
Verified

Student responses should look like the above,with the 4 Ms of Manpower,Machinery,Method,and Material listed.Possible responses include: Manpower- not conditioned to waking up early,I can't wake up at the same time every day,I stay up late the night before sometimes.Machinery- Car failure,Alarm clock reset from power outage,alarm clock turned off by roommate.Method- forgot to set alarm clock,incorrect alarm clock setting (AM vs PM),I could not find the classroom.Material- (these responses can be overlapped with machine answers to some degree)I wore flip flops so I could not walk fast,I could not find a sweater and did not want to go out in the cold,I lacked the proper materials for walking in the snow/ice.

Philip Crosby is credited with both of these quality catch-phrases: "quality is free" and "zero defects."

Free
(True/False)
4.9/5
(38)
Correct Answer:
Verified

True

Which of the following statements regarding Arnold Palmer Hospital is FALSE?

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

D

Pareto charts are used to:

(Multiple Choice)
4.9/5
(41)

Identify the seven major concepts of TQM.

(Essay)
4.9/5
(35)

Create a Pareto chart for the following mistakes made in grading an exam. Create a Pareto chart for the following mistakes made in grading an exam.

(Essay)
4.9/5
(35)

A Six Sigma program has how many defects per million?

(Multiple Choice)
4.8/5
(43)

Quality can improve profitability by reducing costs.Which of the following is not an aspect of reduced costs by quality improvements?

(Multiple Choice)
4.9/5
(29)

The Japanese use the term poka-yoke to refer to continuous improvement.

(True/False)
4.9/5
(42)

PDCA,developed by Shewhart,stands for which of the following?

(Multiple Choice)
4.8/5
(31)

Kaizen is a Japanese term meaning:

(Multiple Choice)
4.8/5
(31)

In a sentence or two,summarize the contribution of Philip Crosby to quality management.

(Essay)
4.8/5
(34)

Describe how ISO 9000 has evolved in the past several years.

(Essay)
5.0/5
(28)

________ diagrams use a schematic technique to discover possible locations of quality problems.

(Essay)
4.9/5
(38)

Perform a Pareto analysis on the following information: Perform a Pareto analysis on the following information:

(Essay)
4.9/5
(34)

Identify the ten determinants of service quality.Describe two of them in a sentence or two each.

(Essay)
4.9/5
(29)

If a sample of parts is measured and the mean of the measurements is outside the control limits,the process is:

(Multiple Choice)
4.7/5
(27)

A checklist is a type of:

(Multiple Choice)
4.8/5
(39)

Techniques for building employee empowerment include:

(Multiple Choice)
4.9/5
(37)

The quality loss function indicates that costs related to poor quality are low as long as the product is within acceptable specification limits.

(True/False)
4.8/5
(33)