Exam 15: Scheduling for the Short-Term
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
The short-term scheduling activity called "loading":
Free
(Multiple Choice)
4.8/5
(28)
Correct Answer:
C
Johnson's rule sequences a set of jobs through two different machines or work centers in the same order.
Free
(True/False)
4.7/5
(29)
Correct Answer:
True
Which of the following is NOT required to be known in order to schedule process-focused facilities?
Free
(Multiple Choice)
4.9/5
(31)
Correct Answer:
B
What does the use of the shortest processing time sequencing rule generally produce?
(Multiple Choice)
4.9/5
(37)
Use Johnson's rule to determine the optimal sequencing for the five jobs to be processed on two machines in a fixed order (Machine 1 before Machine 2).The processing times are given in the table below.
a.What is the optimal sequence?
b.What is the total flow time for this sequence?


(Essay)
4.8/5
(36)
Briefly describe how "the unexpected" makes short-term scheduling at Delta Airlines a challenge.Also describe how Delta meets that challenge,and achieves competitive advantage through short-term scheduling.
(Essay)
5.0/5
(30)
The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the longest processing time rule,what is the lateness of job A? 

(Multiple Choice)
4.9/5
(27)
Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the shortest processing time dispatching rule,in which order should the jobs be processed? 

(Multiple Choice)
4.9/5
(25)
Three jobs are to be assigned to three machines.Cost for each job-machine combination appears in the table below.Perform the first two steps of the assignment method (subtract the smallest number in each row and subtract the smallest number in each column;then cover with straight lines).At this point in the problem-solving process: 

(Multiple Choice)
4.8/5
(37)
There are two jobs to be assigned to two workers.The profit for worker A on job 1 is $5 and on job 2 is $8.The profit for worker B on job 1 is $10 and on job 2 is $12.How should the work be divided using the assignment method?
(Multiple Choice)
5.0/5
(38)
Which of the following is NOT a key direct benefit from effective internal or external scheduling?
(Multiple Choice)
4.9/5
(28)
What is a scheduling technique used to achieve an optimum,one-to-one matching of tasks and resources?
(Multiple Choice)
4.9/5
(41)
In what five ways does the problem of scheduling service systems differ from that of scheduling manufacturing systems?
(Essay)
4.9/5
(41)
Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,what is the optimum sequence of jobs and the minimum time for completion of all jobs? 

(Multiple Choice)
4.8/5
(35)
The following jobs are waiting to be processed at your work center,which cleans valve body castings.Job numbers are assigned sequentially upon arrival in the facility (a missing number means that job does not require your work center).All dates are specified as days from today.
a.In what sequence should the jobs be processed according to the FCFS scheduling rule?
b.In what sequence should the jobs be processed according to the EDD scheduling rule?
c.In what sequence should the jobs be processed according to the SPT scheduling rule?
d.In what sequence should the jobs be processed according to the LPT scheduling rule?
e.In what sequence should the jobs be processed according to the critical ratio scheduling rule?

(Essay)
4.7/5
(41)
Showing 1 - 20 of 116
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)