Exam 9: Layout Decisions
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
________ layouts deal with low-volume,high-variety production with like machines and equipment grouped together.
Free
(Essay)
4.8/5
(38)
Correct Answer:
Process-oriented
________ is the pace (frequency)of production necessary (time per unit)to meet customer orders.
Free
(Essay)
4.8/5
(42)
Correct Answer:
Takt time
An airport is trying to balance where to place the three subgroups (local (A),regional (B),and national (C))for an airline.The distance between terminals and the number of trips that travelers make between subgroups for flight connections per day are listed.Find the assignment that minimizes the distance travelers must walk.


Free
(Essay)
4.9/5
(33)
Correct Answer:
There are 6 possible assignments and the distance traveled for each scenario is 110(Distance A-B)+ 195(Distance C-B)+ 180(Distance A-C)= total distance.
A(1)-B(2)-C(3)= 110(4000)+ 195(6000)+ 180(5000)= 2510K
A(1)-B(3)-C(2)= 110(5000)+ 195(6000)+ 180(4000)= 2440K
A(2)-B(1)-C(3)= 110(4000)+ 195(5000)+ 180(6000)= 2495K
A(2)-B(3)-C(1)= 110(6000)+ 195(5000)+ 180(4000)= 2355K
A(3)-B(2)-C(1)= 110(6000)+ 195(4000)+ 180(5000)= 2340K
A(3)-B(1)-C(2)= 110(5000)+ 195(4000)+ 180(6000)= 2410K
Subgroup A should be assigned terminal 3,subgroup B to terminal 2,and subgroup C to terminal 1 to minimize the distance travelers must go.
Four hundred and eighty minutes of production time are available per day.The schedule calls for the production of 80 units per day.Each unit of the product requires 30 minutes of work.What is the theoretical minimum number of workstations?
(Multiple Choice)
4.9/5
(34)
In assembly-line balancing,cycle time (the ratio of available production time to scheduled production)is the:
(Multiple Choice)
4.8/5
(34)
Assembly line balancing has just been used to solve a product layout problem.Two solutions look especially attractive to the plant managers.Both solutions make the same output per day,and both have the same number of workstations.The managers were going to break the tie by looking at line efficiency,but discovered that both lines had the same efficiency as well.Should they have been surprised at this? Explain.
(Essay)
4.9/5
(39)
An assembly line is assigned as follows.Station 1- task A,B,and C.Station 2- task D.Station 3- task E and F.The task times are 7,3,2,9,4,and 5 minutes respective to A,B,C,D,E,and F.(Assume that there is no precedence relationships between the tasks,i.e.they can be performed in any order)
(a)Calculate the efficiency.
(b)What would the assignment of tasks to stations be using the shortest processing time heuristic (assuming the current maximum station time remains the cycle time)?
(Essay)
4.9/5
(31)
Four hundred and eighty minutes of production time are available per day.Scheduled production is 120 units per day.What is the required cycle time?
(Multiple Choice)
4.9/5
(37)
Category management is the use of computer software to evaluate the profitability of various merchandising plans for hundreds of categories.
(True/False)
4.9/5
(27)
One guideline for a retail layout is to locate high-draw items around the periphery of the store.
(True/False)
4.8/5
(36)
________ avoids placing materials or supplies in storage by processing them as they are received for shipment.
(Essay)
4.8/5
(31)
A company is trying to balance production between 3 workstations on an assembly line.Currently there are 5 tasks that need to be performed.These tasks,ABCDE,have required times of 2 minutes,4 minutes,1 minutes,3 minutes,and 10 minutes,respectively.The assembly line needs to produce 40 units per day to meet demand and can work for up to 8 hours each day.
(a)What is the required cycle time?
(b)What is the theoretical minimum # of workstations?
(c)Assign the tasks according to the shortest task time heuristic.
(Essay)
4.9/5
(34)
A product requires 24 separate tasks,and the sum of those task times is 14 minutes.If the cycle time is 2 minutes,then at least 12 workstations will be needed.
(True/False)
4.8/5
(28)
Cross-docking processes items as they are received,rather than placing them in storage.
(True/False)
4.8/5
(39)
Why do work cells increase the utilization of equipment and machinery?
(Essay)
4.9/5
(30)
The biggest advantage of a product layout is its flexibility to handle a varied product mix.
(True/False)
4.9/5
(34)
Which of the statements below best describes office layout?
(Multiple Choice)
4.9/5
(31)
Which of the following constitutes a major trend influencing office layouts?
(Multiple Choice)
4.8/5
(32)
Brandon's computer shop has hired a consultant to help apply operations management techniques to increase profits.Currently the shop sells most of its computers to a high-end customized online retailer and sales are steady at 250 per month.A single work cell produces the computers.To produce the computer,three operations are required.First the parts must be assembled,next software must be installed,and finally the computer must be safely packed and labeled for shipping.These operations take 2 hours,5 hours,and 1 hour respectively.If there are 6 available work hours each day and the shop operates 20 days per month find:
(a)the takt time,and
(b)the number of workers Brandon should hire.
(Essay)
4.8/5
(32)
Showing 1 - 20 of 146
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)