Exam 19: Statistical Process Control
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
Mean charts and range charts complement one another,one detecting shifts in process average,the other detecting shifts in process dispersion.
Free
(True/False)
5.0/5
(27)
Correct Answer:
True
A Cp value of 1.33 indicates a standard of how many standard deviations (sigmas)?
Free
(Multiple Choice)
4.9/5
(29)
Correct Answer:
E
A city police chief decides to do an annual review of the police department by checking the number of monthly complaints.If the total number of complaints in each of the 12 months were 15,18,13,12,16,20,5,10,9,11,8,and 3 and the police chief wants a 90% confidence level,are the complaints in control?
(Essay)
4.9/5
(30)
________ is a method of measuring samples of lots or batches of product against predetermined standards.
(Essay)
4.9/5
(39)
If μ = 9 ounces,σ = 0.5 ounces,and n = 9,calculate the 3-sigma control limits for the x-bar chart.
(Essay)
4.8/5
(30)
The specification for a plastic liner for concrete highway projects calls for a thickness of 6.0 mm ± 0.1 mm.The standard deviation of the process is estimated to be 0.02 mm.What are the upper and lower specification limits for this product? The process is known to operate at a mean thickness of 6.03 mm.What is the Cp and Cpk for this process? About what percent of all units of this liner will meet specifications?
(Essay)
4.7/5
(38)
An x-bar control chart was examined and no data points fell outside of the limits.Can this process be considered in control?
(Multiple Choice)
4.7/5
(25)
The purpose of process control is to detect when natural causes of variation are present.
(True/False)
4.9/5
(38)
The purpose of an x-bar chart is to determine whether there has been a:
(Multiple Choice)
4.9/5
(29)
A consultant has been brought in to a manufacturing plant to help apply Six Sigma principles.Her first task is to work on the production of rubber balls.The upper and lower spec limits are 21 and 19 cm,respectively.The consultant takes ten samples of size five and computes the sample standard deviation to be .7 cm and the sample mean to be 19.89 cm.Compute Cp and Cpk for the process.Give the consultant advice on what to do with the process based on your findings.
(Essay)
4.9/5
(37)
A lot that is accepted by acceptance sampling is certified to be free of defects.
(True/False)
4.7/5
(28)
________ is variation in a production process that can be traced to specific causes.
(Essay)
4.8/5
(26)
A bank's manager has videotaped 20 different teller transactions to observe the number of mistakes being made.Ten transactions had no mistakes,five had one mistake and five had two mistakes.Compute proper control limits at the 90% confidence level.
(Essay)
4.9/5
(34)
An acceptance sampling plan is to be designed to meet the organization's targets for product quality and risk levels.Which of the following is true?
(Multiple Choice)
4.8/5
(26)
Which of the following statements about acceptance sampling is TRUE?
(Multiple Choice)
4.8/5
(33)
For a 3-sigma x-bar chart where the process standard deviation is known,the upper control limit:
(Multiple Choice)
4.8/5
(28)
Showing 1 - 20 of 144
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)