Exam 20: Simulation
Exam 1: Using Operations to Create Value100 Questions
Exam 2: Process Strategy and Analysis245 Questions
Exam 3: Quality and Performance195 Questions
Exam 4: Capacity Planning108 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems164 Questions
Exam 7: Project Management140 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management207 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning125 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration111 Questions
Exam 15: Supply Chain Sustainability73 Questions
Exam 16: Decision Making107 Questions
Exam 17: Waiting Lines108 Questions
Exam 18: Special Inventory Models53 Questions
Exam 19: Linear Programming86 Questions
Exam 20: Simulation54 Questions
Exam 21: Financial Analysis55 Questions
Exam 22: Acceptance Sampling Plans87 Questions
Exam 23: Measuring Output Rates106 Questions
Exam 24: Learning Curve Analysis51 Questions
Exam 25: Operations Scheduling120 Questions
Exam 26: Layout36 Questions
Select questions type
This table shows the distribution of grades in an operations management class.
Add a column to the table that shows the cumulative probability and indicate what letter grade is obtained when the RAND()function is equal to 0.982245

(Multiple Choice)
4.9/5
(37)
A number that has the same probability of being selected as any other number is a(n)________.
(Essay)
4.9/5
(42)
________ is a feature of simulation models that allows them to obtain operating-characteristic estimates in much less time than is required to gather the same operating data from a real system.
(Essay)
4.8/5
(35)
A patient's interminable wait for the first available physician is modeled in SimQuick using a(n):
(Multiple Choice)
4.9/5
(32)
Refer to the bank process model.The Marketing Department for the bank has decided to run a special promotion for new customers that will increase the number of customers arriving at the bank.The new arrival rate is expected to be an average time between arrivals of 2.0 minutes instead of the current average time between arrivals of 2.5 minutes.With the potential increase in business,the bank manager is concerned about the number of customers who will arrive and leave because the line is full (with 6 customers)and the average wait time in line at the bank.All other parameters of the model remain the same.Using SimQuick,estimate the new arrive and immediately leave rate and average time in line.Should the manager be concerned?
(Essay)
4.7/5
(38)
A simulation model is used to test the impact of the number of sample customers at a supermarket.As the model is run,the decision maker watches the average number of customers in the store rapidly increase from zero until it levels off and holds a constant value.The simulation model is:
(Multiple Choice)
4.9/5
(41)
Any random number has the same likelihood of being selected as any other,regardless of how recently it has been selected.
(True/False)
4.8/5
(44)
The manager of a branch bank wants to build a simulation model of the lobby operation to reduce the waiting time of her customers.The number of customers arriving at any point of time is an example of a(n):
(Multiple Choice)
4.8/5
(30)
One hundred monkeys are typing in Excel spreadsheets when one of them enters =NORM.S.INV(RAND())What is the result of this monkey's function?
(Multiple Choice)
4.9/5
(40)
Why would data need to be collected prior to conducting a simulation?
(Essay)
4.9/5
(42)
The manager of a branch bank wants to build a simulation model of the lobby operation to reduce the waiting time of her customers.The number of tellers is an example of:
(Multiple Choice)
4.9/5
(41)
A variable that is controlled by the decision-maker and will change from one run to the next as different events are simulated is a(n)________.
(Essay)
4.9/5
(31)
Scenario E.1
SimQuick is being used to simulate the following bank process:
Customer arrivals at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes.The Line Buffer holds 6 customers.If a customer arrives and the buffer line is filled,the customer leaves.The Work Station Teller's processing time per customer is normally distributed,with a mean of 3.0 minutes and a standard deviation of 0.5 minutes.The Served Customer Buffer in the flow chart is used to count the number of customers processed during the period simulated.A 2-hour period was simulated.
The SimQuick simulation is run,and the results are as follows:
-Use the information in Scenario E.1.Approximately what percentage of total customers who arrived during the 2-hour period found the buffer full and were not able to enter?


(Multiple Choice)
4.9/5
(36)
Time compression is the feature of simulation that allows managers to obtain operating-characteristic estimates in much less time than is required to gather the same operating data from a real system.
(True/False)
5.0/5
(43)
SimQuick is to be used to simulate the following bank process:
Customers arrive at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes The Line Buffer holds 6 customers.If a customer arrives and the buffer line is filled,the customer leaves.The Work Station Teller's processing time per customer is normally distributed,with a mean of 3.0 minutes and a standard deviation of 0.5 minutes.The Served Customer Buffer in the flowchart is used to count the number of customers processed during the simulation period.A 2-hour period is to be simulated and the simulation should be repeated 30 times.Determine:
a)The number of customers served during the 2-hour period;
b)The percentage of customers who arrived at the bank and left because the buffer line was full;
c)The utilization of the teller (% of time working)during the 2-hour period;

(Essay)
4.9/5
(38)
A manager has been given the table shown below and is asked to generate random numbers.Which of the following statements is TRUE? 

(Multiple Choice)
4.8/5
(41)
Scenario E.1
SimQuick is being used to simulate the following bank process:
Customer arrivals at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes.The Line Buffer holds 6 customers.If a customer arrives and the buffer line is filled,the customer leaves.The Work Station Teller's processing time per customer is normally distributed,with a mean of 3.0 minutes and a standard deviation of 0.5 minutes.The Served Customer Buffer in the flow chart is used to count the number of customers processed during the period simulated.A 2-hour period was simulated.
The SimQuick simulation is run,and the results are as follows:
-Use the information in Scenario E.1.On average,approximately how many customers were waiting in line during the 2-hour simulation period?


(Multiple Choice)
4.8/5
(40)
What are the motivations for using simulation for analyzing processes?
(Essay)
4.9/5
(30)
Showing 21 - 40 of 54
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)