Exam 21: Statistical Process Control
Exam 1: What Is Statistics39 Questions
Exam 2: Graphical Descriptive Techniques I89 Questions
Exam 3: Graphical Descriptive Techniques II179 Questions
Exam 4: A: Numerical Descriptive Techniques202 Questions
Exam 4: B: Numerical Descriptive Techniques39 Questions
Exam 4: C: Numerical Descriptive Techniques18 Questions
Exam 5: Data Collection and Sampling76 Questions
Exam 6: Probability223 Questions
Exam 7: A: Random Variables and Discrete Probability Distributions225 Questions
Exam 7: B: Random Variables and Discrete Probability Distributions44 Questions
Exam 8: Continuous Probability Distributions200 Questions
Exam 9: Sampling Distributions150 Questions
Exam 10: Introduction to Estimation143 Questions
Exam 11: Introduction to Hypothesis Testing179 Questions
Exam 12: Inference About a Population149 Questions
Exam 13: Inference About Comparing Two Populations169 Questions
Exam 14: Analysis of Variance154 Questions
Exam 15: Chi-Squared Tests174 Questions
Exam 16: A: Simple Linear Regression and Correlation246 Questions
Exam 16: B: Simple Linear Regression and Correlation47 Questions
Exam 17: Multiple Regression156 Questions
Exam 18: Model Building137 Questions
Exam 19: Nonparametric Statistics171 Questions
Exam 20: Time-Series Analysis and Forecasting217 Questions
Exam 21: Statistical Process Control133 Questions
Exam 22: Decision Analysis121 Questions
Exam 23: Conclusion45 Questions
Select questions type
Control limits for the p chart are typically placed so that they are 3 standard errors above and below the centerline.
(True/False)
4.8/5
(36)
A trend indicates there is a slow and steady shift in the ____________________ of a process distribution.
(Essay)
4.8/5
(39)
Samples Production
25 samples of size 4 were taken from a manufacturing process.The mean of the sample means and the pooled standard deviation are ,and S = 3.5,respectively.The sample means are listed below.
-{25 Samples Production Narrative} Is the process under control? Discuss.

(Essay)
4.9/5
(37)
When the control chart shows a change in the mean of the process distribution,the result is referred to as:
(Multiple Choice)
4.7/5
(27)
The ____________________ is the expected number of samples that must be taken on average,before the control chart indicates that the process has gone out of control.
(Essay)
4.8/5
(36)
Suppose previously your company decided that a process is out of control when the mean shifts by about 1 standard deviation.Now your company wants to declare a process as being out of control when the mean shifts by .50 standard deviations.In order to do this,the samples must be collected ____________________ often and/or the sample sizes must be ____________________.
(Essay)
4.7/5
(34)
Diaper Delivery
Wrap-M-Up,a Ft.Lauderdale diaper Service,has 10 delivery men who each deliver diapers to 50 customers every day.Wrap-M-Up decides to record the proportion of diapers delivered on time for a 10-day period and construct a p chart to see whether the proportion is too erratic.The data are shown below:
Day 1 2 3 4 5 6 7 8 9 10 Prapartion of Dingers .916 .894 .928 .900 .864 .968 .914 .988 .952 .936 Delivered an Time
-In order to ensure that a manufacturing process is under control,50 samples of size 1,000 were drawn and the number of defectives in each sample was counted.The mean sample proportion was .0234.Compute the centerline and control limits for the p chart.
(Essay)
4.7/5
(33)
Which of the following is NOT something you can do with an operating characteristic curve?
(Multiple Choice)
4.8/5
(41)
Samples Production
The mean of the sample means and the pooled standard deviation of 40 samples of size 8 taken from a production process under control are ,and S = 14.5,respectively.
-{40 Samples Production Narrative} Compute the zone boundaries for the chart.
(Essay)
4.8/5
(42)
If a p control chart finds six increasing or six decreasing sample proportions in a row,this could be an example of assignable cause variation called a(n)____________________.
(Essay)
4.7/5
(32)
When the control chart shows an increase in the standard deviation of the process,the result is referred to as:
(Multiple Choice)
4.8/5
(33)
The average run length indicates how often a false alarm is expected to occur.That is,the average run length is one divided by the probability of a Type ____________________ error.
(Essay)
4.9/5
(35)
Showing 121 - 133 of 133
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)