Exam 11: Operational Decision-Making Tools: Work Measurement
Exam 1: Operations Management58 Questions
Exam 2: Quality Management74 Questions
Exam 3: Statistical Process Control112 Questions
Exam 4: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 5: Product Design83 Questions
Exam 6: Service Design80 Questions
Exam 7: Processes and Technology73 Questions
Exam 8: Capacity and Facilities Design85 Questions
Exam 9: Operational Decision-Making Tools: Facility Location Models21 Questions
Exam 10: Human Resources79 Questions
Exam 11: Operational Decision-Making Tools: Work Measurement31 Questions
Exam 12: Project Management85 Questions
Exam 13: Supply Chain Management: Strategy and Design56 Questions
Exam 14: Global Supply Chain Procurement and Distribution69 Questions
Exam 15: Forecasting85 Questions
Exam 16: Inventory Management78 Questions
Exam 17: Operational Decision-Making Tools: Simulation15 Questions
Exam 18: The Sales and Operations Planning Process76 Questions
Exam 19: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 20: Resource Planning82 Questions
Exam 21: Lean Systems78 Questions
Exam 22: Scheduling78 Questions
Select questions type
How many cycles should be used in a time study in order to be 98% confident that the time-study average job cycle time is within 4% of the true average job cycle time? Assume that the average job cycle time was 4.25 minutes and the standard deviation of the sample was 0.65 minutes.
(Multiple Choice)
4.8/5
(31)
Workers often do not like to be the subject of a time study and are sometimes unwilling to cooperate.
(True/False)
4.8/5
(21)
Rating worker performance is typically an objective,easy task that can be done by any employee.
(True/False)
4.9/5
(30)
For a particular time study,a company would like to be 95% confident that the average job cycle time is within 2% of the true average job cycle time.Assume that the average job cycle time was 6.53 minutes and the standard deviation of the sample was 1.26 minutes.The number of cycles that should be used in this time study would be
(Multiple Choice)
4.9/5
(25)
Work sampling is a technique for determining the proportion of time a worker or machine is idle.
(True/False)
4.8/5
(33)
Briefly discuss the advantages and disadvantages of a predetermined motion time system.
(Essay)
4.9/5
(37)
Determining the length of time it takes to do a job is known as work measurement.
(True/False)
4.8/5
(35)
As part of a time study,a particular job was analyzed.The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported:
Assuming an allowance factor of 15%,the standard time for this job would be

(Multiple Choice)
4.7/5
(42)
Under normal circumstances and conditions,the time required by an "average" worker to perform a job once is referred to as the cycle time.
(True/False)
4.7/5
(36)
Showing 21 - 31 of 31
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)