If a sample of 40 units of output found 500 defects,then the 3-sigma upper control limit for the If a sample of 40 units of output found 500 defects,then the 3-sigma upper control limit for the   chart would be chart would be

Free
(Multiple Choice)
4.7/5
(38)
Correct Answer:
Verified

B

When constructing a control chart for the first time,all points should be within the control limits indicating the process is in control.

Free
(True/False)
4.9/5
(32)
Correct Answer:
Verified

True

If the quality of a process's output is determined by classifying the output as being defective or not defective,use a(n)___ control chart.

Free
(Multiple Choice)
4.7/5
(39)
Correct Answer:
Verified

D

A company produces a product which is designed to weigh 10 oz.,with a tolerance of + 0.5 oz.The process produces products with an average weight of 9.95 oz.and a standard deviation of 0.10 oz.The process capability index for this process,with z = 3,is

(Multiple Choice)
4.9/5
(29)

A sequence of sample points that display a pattern is known as a run.

(True/False)
4.9/5
(42)

When a control chart detects no special cause variation in a process,the upper and lower control limits are the same value.

(True/False)
4.7/5
(39)

Control charts are never implemented until special cause variation has been detected in a process.

(True/False)
4.8/5
(34)

An R-chart monitors the robustness of a process.

(True/False)
4.8/5
(31)

It is possible to have low variation within samples while at the same time having high variation between sample means.

(True/False)
4.9/5
(33)

Tolerances and specification limits report similar information for a given product design.

(True/False)
4.9/5
(37)

Process control charts are rarely useful for monitoring and controlling the output of service processes.

(True/False)
4.9/5
(31)

The range is the difference between the smallest and largest values in a sample.

(True/False)
4.7/5
(34)

Statistical process control involves monitoring and controlling a process to prevent poor quality.

(True/False)
4.7/5
(22)

The process capability index is used only for p and c charts while the process capability ratio is used only for The process capability index is used only for p and c charts while the process capability ratio is used only for   and R charts. and R charts.

(True/False)
4.9/5
(31)

Which of the following control charts is used to monitor the number of defective items within a sample?

(Multiple Choice)
4.9/5
(43)

Attribute (qualitative)control charts are used to monitor descriptive characteristics of the output of a process.

(True/False)
4.9/5
(31)

Statistical process control is based on a philosophy of inspection as opposed to prevention.

(True/False)
4.8/5
(30)

Which of the following control charts is used to control the variation within samples?

(Multiple Choice)
4.9/5
(30)

One reason some companies fail in their attempt to apply statistical process control is lack of training.

(True/False)
4.8/5
(41)

Construction and use of an Construction and use of an   -chart is based on an assumption that the sample points are normally distributed around the centre line. -chart is based on an assumption that the sample points are normally distributed around the centre line.

(True/False)
4.8/5
(34)
Showing 1 - 20 of 112