Exam 20: Resource Planning
Exam 1: Operations Management58 Questions
Exam 2: Quality Management74 Questions
Exam 3: Statistical Process Control112 Questions
Exam 4: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 5: Product Design83 Questions
Exam 6: Service Design80 Questions
Exam 7: Processes and Technology73 Questions
Exam 8: Capacity and Facilities Design85 Questions
Exam 9: Operational Decision-Making Tools: Facility Location Models21 Questions
Exam 10: Human Resources79 Questions
Exam 11: Operational Decision-Making Tools: Work Measurement31 Questions
Exam 12: Project Management85 Questions
Exam 13: Supply Chain Management: Strategy and Design56 Questions
Exam 14: Global Supply Chain Procurement and Distribution69 Questions
Exam 15: Forecasting85 Questions
Exam 16: Inventory Management78 Questions
Exam 17: Operational Decision-Making Tools: Simulation15 Questions
Exam 18: The Sales and Operations Planning Process76 Questions
Exam 19: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 20: Resource Planning82 Questions
Exam 21: Lean Systems78 Questions
Exam 22: Scheduling78 Questions
Select questions type
___ is a lot-sizing technique that orders for multiple demand periods and is referred to as
Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
B
Material requirements planning (MRP)is a useful for all of the following except
Free
(Multiple Choice)
4.8/5
(31)
Correct Answer:
C
Given the following MRP matrix for Item C:
If each order cost $500 and the holding cost is $0.75 per item per period,the periodic order quantity would be

Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
A
Planned order releases at one level of a product structure generate gross requirements at the next level.
(True/False)
4.9/5
(44)
A forecast of dependent demand requirements is one of the major inputs into the MRP process.
(True/False)
4.9/5
(32)
ERP systems are only concerned with production and marketing processes.
(True/False)
4.8/5
(36)
Given the following MRP matrix for Item C:
If each order cost $500 and the holding cost is $0.75 per item per period,then using the Periodic Order Quantity lot sizing technique,the Planned Order Release for period 4 would be

(Multiple Choice)
4.8/5
(28)
The quantities reported on a master production schedule may reflect a combination of actual and forecasted demand.
(True/False)
4.7/5
(35)
Which of the following would not be used for an overloaded condition?
(Multiple Choice)
4.8/5
(36)
A firm has the following gross requirements for Item F.If ordering costs are $60 per order and carrying costs are $0.50 per period.
If EOQ lot sizing is used to set the minimum order quantity,then the planned order releases would be

(Multiple Choice)
4.8/5
(30)
Given the following MRP matrix for Item E:
The planned order releases for period 3 would be

(Multiple Choice)
4.9/5
(35)
Given the following Product Structure Record:
The number of E's required for each A would be

(Multiple Choice)
4.9/5
(34)
The quantities displayed on a master production schedule represent production and not actual demand.
(True/False)
4.8/5
(32)
Single-source ERP systems are often easier to integrate than systems built using the best-in-breed approach.
(True/False)
4.8/5
(39)
What steps are necessary to effectively implement Enterprise Resource Planning (ERP)?
(Essay)
4.8/5
(28)
The application modules that comprise the ERP system are designed to support only customer relationship management processes.
(True/False)
4.8/5
(27)
Given the following MRP matrix for Item C:
If each order cost $500 and the holding cost is $0.75 per item per period,then using the Periodic Order Quantity lot sizing technique,the Planned Order Release for period 1 would be

(Multiple Choice)
4.8/5
(43)
Showing 1 - 20 of 82
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)