For activities on a project's critical path

Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
Verified

A

The ___ is a document that provides a common understanding,justification,and expected result for a project.

Free
(Multiple Choice)
4.9/5
(36)
Correct Answer:
Verified

C

The earliest start time for an activity is at time zero.

Free
(True/False)
4.8/5
(43)
Correct Answer:
Verified

True

Which of the following is not a basic element in a project plan?

(Multiple Choice)
4.8/5
(45)

Using Table 9.2,the critical path for the project consists of activities

(Multiple Choice)
4.9/5
(29)

A project consists of the following activities: Table 9.1 A project consists of the following activities: Table 9.1   Using Table 9.1,the earliest finish (EF)time for activity D is Using Table 9.1,the earliest finish (EF)time for activity D is

(Multiple Choice)
4.7/5
(27)

Using Table 9.3,the amount of slack associated with activity C is

(Multiple Choice)
4.8/5
(31)

Project scheduling is recognized as the most critical element in the project management process.

(True/False)
4.9/5
(32)

Project control involves monitoring a project and measuring its progress toward a successful completion.

(True/False)
4.8/5
(21)

The estimated mean time for an activity with a most likely time (m)equal to 12 weeks,an optimistic time (a)equal to 9 weeks,and a pessimistic time (b)equal to 18 weeks is

(Multiple Choice)
4.9/5
(41)

The upper level of a work breakdown structure for a project highlights summary activities and/or major components.

(True/False)
4.9/5
(37)

The ___ probability distribution is typically used to describe uncertain activity times in a project.

(Multiple Choice)
4.8/5
(30)

Using Table 9.1,the time complete the entire project is

(Multiple Choice)
4.7/5
(29)

Using Table 9.3,the critical path for this project is

(Multiple Choice)
4.8/5
(33)

Using Table 9.1,the earliest start time for activity F is

(Multiple Choice)
4.8/5
(32)

The estimated variance for an activity with a most likely time (m)equal to 12 weeks,an optimistic time (a)equal to 9 weeks,and a pessimistic time (b)equal to 18 weeks is

(Multiple Choice)
4.8/5
(42)

Unlike PERT,CPM incorporates probabilistic time estimates into the project management process.

(True/False)
4.9/5
(36)

Using Table 9.3,the earliest start (ES)time for activity B is

(Multiple Choice)
4.7/5
(27)

Using Table 9.3,the time to complete the entire project would be

(Multiple Choice)
4.9/5
(41)

A project team is typically cross-functional consisting of members throughout an organization.

(True/False)
4.8/5
(47)