Exam 21: Linear Programming
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
A site manager has three day laborers available for eight hours each and a burning desire to maximize his return on their wages.The site manager uses linear programming to assign them to two tasks and notes that he has enough work to occupy 21 labor hours.The linear program that the site manager has constructed has
(Multiple Choice)
4.9/5
(31)
________ is useful for allocating scarce resources among competing demands.
(Short Answer)
4.9/5
(32)
A binding constraint is the amount by which the left-hand side falls short of the right-hand side.
(True/False)
4.8/5
(39)
________ is the amount by which the left-hand side falls short of the right-hand side in a linear programming model.
(Short Answer)
4.7/5
(37)
NYNEX must schedule round-the-clock coverage for its telephone operators.To keep the number of different shifts down to a manageable level,it has only four different shifts.Operators work eight-hour shifts and can begin work at either midnight,8 a.m.,noon,or 4 p.m.Operators are needed according to the following demand pattern,given in four-hour time blocks.
Time Period Operators Needed midnight to 4 a.m. 4 4 a.m. to 8 a.m. 6 8 a.m. to noon 90 Noon to 4 p.m. 85 4 p.m. to 8 p.m. 55 8 p.m. to midnight 29
Formulate this scheduling decision as a linear programming problem,defining fully your decision variables and then giving the objective function and constraints.
(Essay)
4.8/5
(31)
________ is the amount by which the left-hand side exceeds the right-hand side in a linear programming model.
(Short Answer)
4.9/5
(35)
The interval over which the right-hand-side parameter can vary while its shadow price remains valid is the ________.
(Short Answer)
4.9/5
(31)
The ________ is the upper and lower limit over which the optimal values of the decision variables remain unchanged.
(Short Answer)
5.0/5
(37)
The simplex method is an interactive algebraic procedure for solving linear programming problems.
(True/False)
4.9/5
(29)
A(n)________ is a value that the decision maker cannot control and that does not change when the solution is implemented.
(Short Answer)
4.8/5
(25)
A producer has three products,A,B,and C,which are composed from many of the same raw materials and subassemblies by the same skilled workforce.Each unit of product A uses 15 units of raw material X,a single purge system subassembly,a case,a power cord,three labor hours in the assembly department,and one labor hour in the finishing department.Each unit of product B uses 10 units of raw material X,five units of raw material Y,two purge system subassemblies,a case,a power cord,five labor hours in the assembly department,and 90 minutes in the finishing department.Each unit of product C uses five units of raw material X,25 units of raw material Y,two purge system subassemblies,a case,a power cord,seven labor hours in the assembly department,and three labor hours in the finishing department.Labor between the assembly and finishing departments is not transferable,but workers within each department work on any of the three products.There are three full-time (40 hours/week)workers in the assembly department and one full-time and one half-time (20 hours/week)worker in the finishing department.At the start of this week,the company has 300 units of raw material X,400 units of raw material Y,60 purge system subassemblies,40 cases,and 50 power cords in inventory.No additional deliveries of raw materials are expected this week.There is a $90 profit on product A,a $120 profit on product B,and a $150 profit on product C.The operations manager doesn't have any firm orders,but would like to make at least five of each product so he can have the products on the shelf in case a customer wanders in off the street.
Formulate the objective function and all constraints,and clearly identify each constraint by the name of the resource or condition it represents.
(Essay)
5.0/5
(39)
The assumption of ________ allows a decision maker to combine the profit from one product with the profit from another to realize the total profit from a feasible solution.
(Short Answer)
4.9/5
(32)
A constraint is a limitation that restricts the permissible choices.
(True/False)
4.8/5
(28)
Decision variables are represented in both the objective function and the constraints while formulating a linear program.
(True/False)
4.7/5
(37)
Which of the following statements regarding linear programming is NOT true?
(Multiple Choice)
4.8/5
(33)
Showing 41 - 57 of 57
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)