Exam 13: Six Sigma Management and Lean Tools
Exam 1: Differing Perspectives on Quality111 Questions
Exam 2: Quality Theory101 Questions
Exam 3: Global Supply Chain Quality and International Quality Standards103 Questions
Exam 4: Strategic Quality Planning104 Questions
Exam 5: The Voice of the Customer100 Questions
Exam 6: The Voice of the Market102 Questions
Exam 7: Quality and Innovation in Product and Process Design101 Questions
Exam 8: Designing Quality Services104 Questions
Exam 9: Managing Supplier Quality in the Supply Chain77 Questions
Exam 10: The Tools of Quality98 Questions
Exam 11: Statistically Based Quality Improvement for Variables99 Questions
Exam 12: Statistically Based Quality Improvement for Attributes100 Questions
Exam 13: Six Sigma Management and Lean Tools101 Questions
Exam 14: Managing Quality Improvement Teams and Projects101 Questions
Exam 15: Implementing and Validating the Quality System96 Questions
Select questions type
The efficacy of a business case is checked using the mnemonic RUMBA. The "M" in RUMBA stands for ________.
Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
D
Black belts are trained in basic quality tools and work in teams to improve quality.
Free
(True/False)
4.9/5
(35)
Correct Answer:
False
The Taguchi method focuses primarily on ________.
Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
C
Process FMEA, process capability assessments, basic statistics, and decision making are the tools used in the ________ phase of the DMAIC process.
(Multiple Choice)
4.9/5
(31)
What is the Taguchi constant for a device that costs $250 to repair and a tolerance of plus or minus 2 mm with a mean squared deviation from the target of 0.2?
(Multiple Choice)
4.8/5
(32)
What is robust design and what are the different types of design that compose it?
(Essay)
4.8/5
(36)
What is the Taguchi constant for a device that costs $200 to repair and a tolerance of plus or minus 0.25 mm with a mean squared deviation from the target of 0.6?
(Multiple Choice)
4.7/5
(42)
What are the titles and roles of the key players in Six Sigma efforts?
(Essay)
4.9/5
(37)
In the Taguchi method, levels of parameters are also known as ________.
(Multiple Choice)
4.8/5
(40)
The job of the champion is to work with black belts to identify possible projects.
(True/False)
4.9/5
(34)
The Pitman arm on a car costs $105 to repair. Compute the quality loss function for losses incurred as a result of deviation from a target where a tolerance of 10 plus or minus 0.125 is required and the mean squared deviation (V) from the target is (0.33)2.
(Multiple Choice)
4.8/5
(27)
At the core of Six Sigma is the equation Y = f(X) where Y represents ________.
(Multiple Choice)
4.9/5
(36)
The process of selecting control factors and determining optimal levels for them is known as ________.
(Multiple Choice)
4.9/5
(32)
What is gauge R&R and what are some of reasons that can result in problems of measurements?
(Essay)
4.8/5
(41)
Concept design is the process of examining competing technologies to produce a product.
(True/False)
4.9/5
(37)
The goal with a process map is to identify value-added activities.
(True/False)
4.9/5
(27)
Briefly describe each of the Taguchi design perspectives. Which of the four perspectives does the Taguchi method focus on?
(Essay)
4.8/5
(27)
Which key player in Six Sigma works with black belts to identify possible projects and is at the CEO or VP level depending on company size?
(Multiple Choice)
4.9/5
(36)
Showing 1 - 20 of 101
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)