Exam 12: Statistically Based Quality Improvement for Attributes
Exam 1: Differing Perspectives on Quality111 Questions
Exam 2: Quality Theory101 Questions
Exam 3: Global Supply Chain Quality and International Quality Standards103 Questions
Exam 4: Strategic Quality Planning104 Questions
Exam 5: The Voice of the Customer100 Questions
Exam 6: The Voice of the Market102 Questions
Exam 7: Quality and Innovation in Product and Process Design101 Questions
Exam 8: Designing Quality Services104 Questions
Exam 9: Managing Supplier Quality in the Supply Chain77 Questions
Exam 10: The Tools of Quality98 Questions
Exam 11: Statistically Based Quality Improvement for Variables99 Questions
Exam 12: Statistically Based Quality Improvement for Attributes100 Questions
Exam 13: Six Sigma Management and Lean Tools101 Questions
Exam 14: Managing Quality Improvement Teams and Projects101 Questions
Exam 15: Implementing and Validating the Quality System96 Questions
Select questions type
The first step in developing an attribute process chart is to ________.
Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
D
The np chart is a graph of the number of defectives in a subgroup.
Free
(True/False)
4.7/5
(36)
Correct Answer:
True
An irregularity or problem with a larger unit is a(n) ________.
Free
(Multiple Choice)
4.9/5
(36)
Correct Answer:
A
Two components of reliability 0.90 are in parallel and this subsystem is connected in series to a component with a reliability of 0.95. The overall system reliability is ________.
(Multiple Choice)
4.9/5
(28)
Fifty crash helmets are tested for one hundred hours per helmet. Of all the helmets tested, only one experiences a malfunction during the test. What is the failure rate for the helmets?
(Multiple Choice)
4.8/5
(25)
The reliability model that shows that products are more likely to fail either very early in their useful life or very late in their useful life is called the ________.
(Multiple Choice)
4.8/5
(39)
What is the useful life in hours for a product having a reliability of 0.985 and a failure rate of 0.015 failures per hour?
(Multiple Choice)
4.9/5
(34)
An np chart can be used whether or not the sample sizes are the same.
(True/False)
4.8/5
(41)
Reliability models assume statistical independence between failure events. This means that ________.
(Multiple Choice)
4.9/5
(30)
What is a u chart and how is it similar to or different than a c chart?
(Essay)
4.8/5
(39)
The object of using process charts is to continually improve your processes.
(True/False)
4.8/5
(39)
What is the system availability for something that has a mean time between failures of 100 hours and needs an average of 4 hours to repair when it does fail?
(Multiple Choice)
4.9/5
(34)
________ attributes relate to senses of touch, smell, taste, and sound.
(Multiple Choice)
4.8/5
(27)
One way to raise system availability would be to lower the mean time to repair.
(True/False)
4.9/5
(42)
What is the approximate useful life in hours for a product having a reliability of 0.9978 and a failure rate of 0.001 failures per hour?
(Multiple Choice)
4.8/5
(34)
Production-related attributes are more important to quality managers than customer-based attributes.
(True/False)
4.9/5
(34)
The atmosphere and other aspects of a customer's experience in a hotel would be examples of sensory attributes.
(True/False)
4.8/5
(32)
A system is composed of three components in series having reliabilities of 0.99, 0.98, and 0.97. What is the overall system reliability?
(Multiple Choice)
4.7/5
(26)
If a set of components is in a series, as opposed to being parallel, the system can function if a given component in the system fails.
(True/False)
4.8/5
(33)
Showing 1 - 20 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)