Exam 15: Lean Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The quality management tool called poka-yoke is not relevant to JIT systems.

(True/False)
4.9/5
(42)

Which of the following is FALSE regarding the links between JIT and quality?

(Multiple Choice)
4.8/5
(38)

What are the 5Ss? Why does the list of the 5Ss sometimes have seven elements?

(Essay)
4.8/5
(48)

Kanban is associated with all EXCEPT which of the following?

(Multiple Choice)
4.9/5
(33)

Product storage is an example of waste in the sense that no value is added.

(True/False)
4.8/5
(35)

A product has annual demand of 1,000,000 units. The plant manager wants production to follow a two-hour cycle. Based on the following data, what setup time will enable the desired production cycle? d = 4000 units per day (250 days per year), p = 8000 units per day, H = $60 per unit per year, Q = 1000 (demand for two hours), and the hourly labor rate is $30.

(Multiple Choice)
4.9/5
(41)

Lead time for computers is 5 days with daily demand of 15 and safety stock of 5 computers. If management wants to use 10 kanbans how many computers should each one hold?

(Multiple Choice)
4.8/5
(35)

A manufacturer took the following actions to reduce inventory. Which of these is generally NOT accepted as a JIT action?

(Multiple Choice)
5.0/5
(34)

Weekly usage of a product is 8 units. Since the plant operates 50 weeks per year, this leads to annual usage of 400 units. Setup cost is $40 and annualized carrying cost is $80. Weekly production of this product is 12 units. Lead time is four weeks, and safety stock is one week's production. What is optimal kanban size? What is the optimal number of kanbans?

(Short Answer)
4.8/5
(41)

U.S. managers often add two additional Ss to the Japanese 5S checklist, ________ and ________, that contribute to establishing and maintaining a Lean workplace.

(Short Answer)
4.8/5
(45)

Which of the following is specifically characterized by continuous and forced problem solving via a focus on throughput and reduced inventory?

(Multiple Choice)
4.7/5
(37)

Which of the following statements regarding a pull system is TRUE?

(Multiple Choice)
4.8/5
(41)

TPS stands for ________.

(Short Answer)
5.0/5
(47)

Identify some of the signals that kanban systems use.

(Essay)
4.9/5
(43)

What are the underlying principles of Toyota's standard work practices?

(Essay)
4.8/5
(38)

A kanban system requires that the process has little variability in lead time because shortages impact the entire production system.

(True/False)
4.7/5
(35)

One goal of JIT partnerships is the reduction of setup cost by delivery in large lots directly to the using department as needed.

(True/False)
4.9/5
(36)

A scheduler may find that freezing the portion of the schedule closest to the due dates allows the production system to function and the schedule to be met.

(True/False)
4.8/5
(36)

JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from the JIT firm to the suppliers.

(True/False)
4.9/5
(43)

Which one of the following is a characteristic of a JIT partnership?

(Multiple Choice)
4.9/5
(39)
Showing 21 - 40 of 122
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)