Exam 15: Lean Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Lead time for cakes is 2 days with daily demand of 4 cakes and a safety stock of 1/2 day. Each container (kanban) holds 2 cakes. What is the correct number of kanbans?

(Multiple Choice)
4.7/5
(41)

TPS stands for Total Production Streamlining.

(True/False)
4.8/5
(33)

The cook in a fast-food restaurant knows that 2 hamburger patties and an order of fries should be started for each car that is waiting in line. This is best an example of:

(Multiple Choice)
4.9/5
(27)

If a factory wants to cut its current lot size in half, by what proportion must setup cost change?

(Multiple Choice)
4.8/5
(36)

Which one is NOT an application of lean principle in services?

(Multiple Choice)
4.7/5
(34)

Characteristics of just-in-time partnerships do NOT include:

(Multiple Choice)
4.8/5
(41)

The 5S category simplify/straighten means: "When in doubt, throw it out."

(True/False)
4.9/5
(32)

The 5Ss:

(Multiple Choice)
4.8/5
(35)

Daily usage of an assembly is 100 in a facility that operates 300 days of the year. Setup cost is $5 and annualized carrying cost is $160 per unit. Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway. Lead time is 3 days; safety stock is 1/2 day's production. What is the optimum kanban size, and number of kanbans?

(Short Answer)
4.7/5
(32)

________ is any deviation from the optimum process that delivers perfect product on time, every time.

(Short Answer)
4.8/5
(44)

Which of the following is NOT one of the Seven Wastes?

(Multiple Choice)
4.9/5
(39)

Identify three major sources of variability.

(Essay)
4.7/5
(47)

________ involve scheduling products so that each day's production meets the demand for that day.

(Short Answer)
4.8/5
(41)

A certain product has been effectively managed in the past, according to its managers. The previous technique used the economic production quantity model, and resulted in an optimum lot size of 100. For this product, setup time is directly proportional to setup cost, and setup time is currently 40 minutes per batch. How much must setup time decline in order for the lot size to fall to 50 units? 25 units? 10 units?

(Essay)
4.7/5
(44)

Identify JIT scheduling tactics.

(Essay)
5.0/5
(46)

The 5S category ________ includes analysis to improve workflow and reduce wasted motion.

(Short Answer)
4.9/5
(35)

Many suppliers feel that having a variety of customers is better than being tied to long-term contracts with one customer.

(True/False)
4.9/5
(35)

The first step in reducing setup times is the separation of setup into preparation activities and actual setup, so that as much work as possible can be done while the machine or process is operating.

(True/False)
4.9/5
(48)

What is a kanban?

(Short Answer)
4.7/5
(37)

How can a reduction of in-transit inventory be encouraged?

(Multiple Choice)
4.8/5
(41)
Showing 101 - 120 of 122
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)