Integrating a project's work packages within the organization's management structure is known as work breakdown structure.

Free
(True/False)
4.7/5
(35)
Correct Answer:
Verified

False

A project professional has just been assigned manager of a project to develop a new advertising campaign for an established product. What is the second step the project manager should do?

Free
(Multiple Choice)
4.9/5
(36)
Correct Answer:
Verified

A

The definition of the end result or mission of your project, or what you expect to deliver to your customer when the project is complete is the project ___________.

Free
(Multiple Choice)
4.8/5
(33)
Correct Answer:
Verified

A

Scope creep is a big issue when managing projects. Which of the following is NOT true regarding scope creep?

(Multiple Choice)
4.8/5
(33)

There are 5 steps involved when defining a project; which of the following is the last?

(Multiple Choice)
4.8/5
(37)

The fact that a new home being built must meet local building codes is an example of a limit and exclusion.

(True/False)
4.8/5
(44)

Within any project, the first step of project scope definition is to

(Multiple Choice)
4.8/5
(41)

An activity that represents a major segment of work is a good example of a milestone.

(True/False)
4.9/5
(35)

The need for a functioning computer in countries having different electrical systems is an example of a ________.

(Multiple Choice)
4.8/5
(33)

All of the following are usually included in a work package EXCEPT

(Multiple Choice)
4.9/5
(32)

The final step in defining a project is __________ the WBS for the information system.

(Multiple Choice)
4.7/5
(33)

Which of the following is least likely to be included in a work package?

(Multiple Choice)
5.0/5
(36)

A priority matrix helps project managers manage trade-offs among time, cost and performance or scope. This helps to identify which criterion is constrained, which should be enhanced and which can be accepted. Some argue that all of these criteria are always constrained. Agree or disagree? Explain why.

(Essay)
4.9/5
(40)

Process breakdown structures are used when the size and the scope of the project do not warrant an elaborate WBS or OBS.

(True/False)
4.9/5
(36)

The intersection of work packages and the organizational unit creates a project control point called a cost account.

(True/False)
4.7/5
(27)

The ability of a 911 emergency system to identify the caller's phone number and location is considered to be a

(Multiple Choice)
4.8/5
(37)

The project charter provides the project manager with written authority to use organizational resources for project activities.

(True/False)
4.7/5
(35)

The lowest element in the hierarchical breakdown of the WBS is

(Multiple Choice)
4.9/5
(37)

The project scope statement indicates that the client is responsible for training the people who will be using the equipment and that the project team will train the client's trainers. This is an example of

(Multiple Choice)
4.8/5
(35)

If a project is small and does not require an elaborate system to assign tasks, which of the following is a good choice?

(Multiple Choice)
4.9/5
(38)