Exam 13: Progress and Performance Measurement and Evaluation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following methods will measure the cost efficiency of the work accomplished to date?

Free
(Multiple Choice)
4.8/5
(42)
Correct Answer:
Verified

C

Which of the following is NOT true regarding scope creep?

Free
(Multiple Choice)
5.0/5
(39)
Correct Answer:
Verified

A

The first step in the project control process for measuring and evaluating project performance is to

Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
Verified

A

________ is simply the percent complete times the original budget.

(Multiple Choice)
4.8/5
(34)

All projects need some form of formal control. Agree or disagree? Support you answer.

(Essay)
4.7/5
(33)

A ___________ Gantt chart is a simple and effective way to depict progress on a project.

(Multiple Choice)
4.8/5
(36)

A reason that the duration on a task may differ from an original duration on a tracking Gantt chart could be

(Multiple Choice)
4.7/5
(36)

A CPI index of 1.18 indicates that the project is currently ________ schedule.

(Multiple Choice)
5.0/5
(31)

Although it is very difficult to measure, measuring ________ performance is as important as measuring schedule and cost performance.

(Multiple Choice)
4.9/5
(40)

The final step in the project control process for measuring and evaluating project performance is to

(Multiple Choice)
4.8/5
(36)

Because of their easy-to-understand visual format, ________ charts are the most favored, used, and understandable tool used to report project schedule status.

(Multiple Choice)
4.8/5
(27)

The only accurate method for determining the true time progress of the project is to compare the project network schedule against the actual network schedule to measure if the project is on time.

(True/False)
4.9/5
(37)

Because of their easy-to-understand visual format, tracking Gantt charts are the most favored, used, and understandable option for reporting project status.

(True/False)
4.8/5
(26)

The PV, AC and CV are all required to assess the current status of the project.

(True/False)
4.8/5
(47)

The ________ variance is the difference between the earned value to date and the baseline schedule.

(Multiple Choice)
4.8/5
(27)

The ________ rule assumes credit is earned for having performed the work once it is completed. This rule is usually used for work packages having very short durations.

(Multiple Choice)
4.8/5
(38)

Given that the AC = 500, PV = 400 and EV = 300, this project is currently _________ budget and ______ schedule.

(Multiple Choice)
4.8/5
(34)

The indicator that tells you the amount each remaining dollar must earn for the project to stay within budget is the

(Multiple Choice)
4.9/5
(31)

Baseline project budgets are derived from time-phasing the work ________.

(Multiple Choice)
5.0/5
(44)

The value that tells you the planned value of work that has actually been completed is the

(Multiple Choice)
4.8/5
(38)
Showing 1 - 20 of 98