Exam 17: Scheduling
Exam 1: Introduction to Operations and Supply Chain Management102 Questions
Exam 2: Quality Management88 Questions
Exam 3: Statistical Process Control157 Questions
Exam 4: Product Design95 Questions
Exam 5: Service Design91 Questions
Exam 6: Processes and Technology81 Questions
Exam 7: Capacity and Facilities Design128 Questions
Exam 8: Human Resources131 Questions
Exam 9: Project Management106 Questions
Exam 10: Supply Chain Management Strategy and Design72 Questions
Exam 11: Global Supply Chain Procurement and Distribution122 Questions
Exam 12: Forecasting92 Questions
Exam 13: Inventory Management127 Questions
Exam 14: Sales and Operations Planning123 Questions
Exam 15: Resource Planning97 Questions
Exam 16: Lean Systems88 Questions
Exam 17: Scheduling96 Questions
Select questions type
The theory of constraints (TOC) approach to scheduling concentrates on scheduling the bottleneck resources.
(True/False)
4.7/5
(37)
Which of the following is not part of the procedure for a minimization problem under the assignment method of loading?
(Multiple Choice)
4.8/5
(40)
The dispatch list contains the order in which the work is assigned to a productive resource.
(True/False)
4.9/5
(34)
If the following jobs are sequenced according to the SPT rule, then the maximum job tardiness (in days) is (assume zero for today's date) 

(Multiple Choice)
4.8/5
(32)
Finite scheduling will not load a resource beyond its fixed capacity.
(True/False)
4.8/5
(38)
If the following jobs are sequenced according to the LPT rule, then the mean completion time (in days) for all jobs is (assume zero for today's date) 

(Multiple Choice)
4.8/5
(34)
A scheduling technique which loads without regards to capacity, then levels the load and sequences the jobs is known as
(Multiple Choice)
4.7/5
(43)
If the following jobs are sequenced according to the DDATE rule, then the mean tardiness (in days) for all jobs is (assume zero for today's date) 

(Multiple Choice)
4.9/5
(37)
If the following jobs are sequenced according to the DDATE rule, then the mean completion time (in days) for all jobs is (assume zero for today's date) 

(Multiple Choice)
4.7/5
(28)
Automated scheduling systems typically include the following features except
(Multiple Choice)
4.8/5
(39)
Johnson's rule gives an optimal sequence for jobs processed serially through a two step system.
(True/False)
4.9/5
(42)
If the following jobs are sequenced according to the DDATE rule, then the maximum job tardiness (in days) is (assume zero for today's date) 

(Multiple Choice)
4.8/5
(38)
The assignment method of linear programming can be used for both the loading and employee scheduling.
(True/False)
4.9/5
(27)
If the following jobs are sequenced according to the FCFS rule, then the mean tardiness (in days) for all jobs would be (assume zero for today's date) 

(Multiple Choice)
4.9/5
(33)
If the following jobs are sequenced according to the LPT rule, then the total number of jobs that would be late is (assume zero for today's date) 

(Multiple Choice)
4.9/5
(41)
The shortest processing time (SPT) rule is most useful when the job shop is not congested.
(True/False)
4.9/5
(38)
Typically, there are more options available when scheduling employees because labour is a very flexible resource.
(True/False)
4.9/5
(45)
If the following jobs are sequenced according to the SPT rule, then the total number of jobs that would be late is (assume zero for today's date) 

(Multiple Choice)
4.9/5
(41)
Showing 61 - 80 of 96
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)