The theory of constraints (TOC) approach to scheduling concentrates on scheduling the bottleneck resources.

(True/False)
4.7/5
(37)

Which of the following is not part of the procedure for a minimization problem under the assignment method of loading?

(Multiple Choice)
4.8/5
(40)

The dispatch list contains the order in which the work is assigned to a productive resource.

(True/False)
4.9/5
(34)

If the following jobs are sequenced according to the SPT rule, then the maximum job tardiness (in days) is (assume zero for today's date) If the following jobs are sequenced according to the SPT rule, then the maximum job tardiness (in days) is (assume zero for today's date)

(Multiple Choice)
4.8/5
(32)

The process of smoothing out the work assigned is known as

(Multiple Choice)
5.0/5
(43)

Finite scheduling will not load a resource beyond its fixed capacity.

(True/False)
4.8/5
(38)

If the following jobs are sequenced according to the LPT rule, then the mean completion time (in days) for all jobs is (assume zero for today's date) If the following jobs are sequenced according to the LPT rule, then the mean completion time (in days) for all jobs is (assume zero for today's date)

(Multiple Choice)
4.8/5
(34)

A scheduling technique which loads without regards to capacity, then levels the load and sequences the jobs is known as

(Multiple Choice)
4.7/5
(43)

If the following jobs are sequenced according to the DDATE rule, then the mean tardiness (in days) for all jobs is (assume zero for today's date) If the following jobs are sequenced according to the DDATE rule, then the mean tardiness (in days) for all jobs is (assume zero for today's date)

(Multiple Choice)
4.9/5
(37)

If the following jobs are sequenced according to the DDATE rule, then the mean completion time (in days) for all jobs is (assume zero for today's date) If the following jobs are sequenced according to the DDATE rule, then the mean completion time (in days) for all jobs is (assume zero for today's date)

(Multiple Choice)
4.7/5
(28)

Automated scheduling systems typically include the following features except

(Multiple Choice)
4.8/5
(39)

Johnson's rule gives an optimal sequence for jobs processed serially through a two step system.

(True/False)
4.9/5
(42)

If the following jobs are sequenced according to the DDATE rule, then the maximum job tardiness (in days) is (assume zero for today's date) If the following jobs are sequenced according to the DDATE rule, then the maximum job tardiness (in days) is (assume zero for today's date)

(Multiple Choice)
4.8/5
(38)

The assignment method of linear programming can be used for both the loading and employee scheduling.

(True/False)
4.9/5
(27)

If the following jobs are sequenced according to the FCFS rule, then the mean tardiness (in days) for all jobs would be (assume zero for today's date) If the following jobs are sequenced according to the FCFS rule, then the mean tardiness (in days) for all jobs would be (assume zero for today's date)

(Multiple Choice)
4.9/5
(33)

If the following jobs are sequenced according to the LPT rule, then the total number of jobs that would be late is (assume zero for today's date) If the following jobs are sequenced according to the LPT rule, then the total number of jobs that would be late is (assume zero for today's date)

(Multiple Choice)
4.9/5
(41)

The shortest processing time (SPT) rule is most useful when the job shop is not congested.

(True/False)
4.9/5
(38)

Job shop scheduling is also known as shop floor control.

(True/False)
4.8/5
(42)

Typically, there are more options available when scheduling employees because labour is a very flexible resource.

(True/False)
4.9/5
(45)

If the following jobs are sequenced according to the SPT rule, then the total number of jobs that would be late is (assume zero for today's date) If the following jobs are sequenced according to the SPT rule, then the total number of jobs that would be late is (assume zero for today's date)

(Multiple Choice)
4.9/5
(41)