If the following jobs are sequenced according to the SLACK rule, then the maximum job tardiness (in days) is (assume zero for today's date) If the following jobs are sequenced according to the SLACK rule, then the maximum job tardiness (in days) is (assume zero for today's date)

(Multiple Choice)
4.8/5
(35)

Scheduling specifies when labour, equipment and facilities are needed to produce a product.

(True/False)
4.7/5
(38)

Explain what sequencing is and use rules and quantitative tools for optimizing the sequence of jobs processed through one or two workstations.

(Essay)
4.8/5
(35)

The wide variety of jobs in a job shop makes scheduling difficult.

(True/False)
4.8/5
(37)

Explain what loading is and use the assignment method to load work on to limited resources.

(Essay)
4.9/5
(36)

Job-shop scheduling is usually performed by skilled machine operators.

(True/False)
4.8/5
(35)

What makes scheduling so difficult in a job shop?

(Essay)
4.7/5
(35)

The longest processing time (LPT) rule tends to complete larger jobs in-house when subcontracting is anticipated.

(True/False)
4.8/5
(37)

A ___ chart is used to show both planned and completed activities against a time scale.

(Multiple Choice)
4.7/5
(32)

Explain the basics of finite scheduling, and use the theory of constraints procedure to schedule multiple jobs through multiple workstations.

(Essay)
4.7/5
(43)

The process of prioritizing jobs that have been assigned to a resource is called

(Multiple Choice)
4.9/5
(39)

All sequencing rules strive to optimize both processing efficiency and due date performance.

(True/False)
4.9/5
(37)

If the following jobs are sequenced according to the SPT rule, then the mean tardiness (in days) for all the jobs is (assume zero for today's date) If the following jobs are sequenced according to the SPT rule, then the mean tardiness (in days) for all the jobs is (assume zero for today's date)

(Multiple Choice)
4.9/5
(29)

Discuss some of the complexities involved with scheduling employees in the service firms.

(Essay)
4.9/5
(42)

The time required for a job to move through the system is referred to as flow time.

(True/False)
4.8/5
(36)

Use a heuristic to schedule workers and explain the capabilities provided by employee scheduling software.

(Essay)
4.8/5
(44)