Exam 3: Statistical Process Control
Exam 1: Introduction to Operations and Supply Chain Management102 Questions
Exam 2: Quality Management88 Questions
Exam 3: Statistical Process Control157 Questions
Exam 4: Product Design95 Questions
Exam 5: Service Design91 Questions
Exam 6: Processes and Technology81 Questions
Exam 7: Capacity and Facilities Design128 Questions
Exam 8: Human Resources131 Questions
Exam 9: Project Management106 Questions
Exam 10: Supply Chain Management Strategy and Design72 Questions
Exam 11: Global Supply Chain Procurement and Distribution122 Questions
Exam 12: Forecasting92 Questions
Exam 13: Inventory Management127 Questions
Exam 14: Sales and Operations Planning123 Questions
Exam 15: Resource Planning97 Questions
Exam 16: Lean Systems88 Questions
Exam 17: Scheduling96 Questions
Select questions type
Some companies that strive to achieve extremely high quality use Z=6 (six sigma) vs. Z=3 (three sigma) when constructing control limits.
(True/False)
4.8/5
(37)
Which of the following control charts is used to control the variation between samples?
(Multiple Choice)
4.7/5
(31)
Information from an R-chart can be used to construct the control limits for an
-chart.

(True/False)
4.7/5
(34)
Process control charts are rarely useful for monitoring and controlling the output of service processes.
(True/False)
4.7/5
(28)
It is sometimes not necessary to determine new control limits after special cause variation has been identified if the source has been eliminated without changing the process.
(True/False)
4.8/5
(30)
Statistical process control is based on a philosophy of inspection as opposed to prevention.
(True/False)
4.7/5
(36)
The individual that detects special cause variation in a process is not allowed to diagnose the root cause and correct it.
(True/False)
4.8/5
(37)
An
and R-chart constructed to monitor and control a process use same raw data.

(True/False)
4.7/5
(30)
Acceptance sampling is consistent with TQM's philosophy of zero defects.
(True/False)
4.8/5
(43)
For a given process, the process capability ratio is not related to its control limits.
(True/False)
5.0/5
(30)
Choosing among a single-, double- and multiple-sampling plans is a strategic versus an economic decision.
(True/False)
4.9/5
(38)
The process centre line for both
and R-charts are both the same value because they are based on the same raw data.

(True/False)
4.8/5
(34)
Which of the following control charts is used to monitor the proportion of defective items within a sample?
(Multiple Choice)
4.9/5
(30)
Statistical process control is a subset of statistical quality control.
(True/False)
4.9/5
(43)
Excel can be used to increase the efficiency and accuracy of determining the process capability ratio and the process capability index.
(True/False)
5.0/5
(31)
To monitor the number of blemishes on a polished surface, a company randomly selects 10 units of output from its process and counts the number of blemishes on each unit. The sample results are shown below:
Given the sample information above, the standard deviation of the number of defects for this process would be

(Multiple Choice)
4.9/5
(31)
The expected number of defective items that will pass on to the customer with a sampling plan is known as the
(Multiple Choice)
4.9/5
(35)
If a sample of 40 units of output found 500 defects, then the centre line for monitoring the average number of defects per unit of output would be
(Multiple Choice)
4.8/5
(36)
Control limits are based on the special cause variation inherent in a process.
(True/False)
4.9/5
(38)
Showing 81 - 100 of 157
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)